United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2023 requests) โ page 37
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 918573, Vance County Solar ยท Masked |
55.0 MW | Withdrawn / abandoned |
| La Feria Irrigation District 1 Solar Solar ยท La Patrona Floating Solar LLC |
54.4 MW | Withdrawn / abandoned |
| Harlingen Irrigation District 1 Solar Solar ยท Six Shooter Floating Solar LLC |
54.3 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
53.7 MW | Withdrawn / abandoned |
| Nemo Storage Battery storage |
53.0 MW | Withdrawn / abandoned |
| Twig Solar + storage |
52.0 MW | Withdrawn / abandoned |
| Solar project GI-2023-13, Garfield County Solar |
52.0 MW | Withdrawn / abandoned |
| Pumpkin Valley Battery storage |
52.0 MW | Withdrawn / abandoned |
| Solar Solar |
51.5 MW | Withdrawn / abandoned |
| La Media Battery storage |
51.5 MW | Withdrawn / abandoned |
| Glossy Garlic Solar Solar + storage |
51.0 MW | Withdrawn / abandoned |
| Patina Battery storage |
51.0 MW | Withdrawn / abandoned |
| Other project SP108, Pinal County Other |
50.8 MW | Withdrawn / abandoned |
| Unruh Storage Battery storage ยท BT Unruh Solar, LLC |
50.5 MW | Withdrawn / abandoned |
| Peridot Storage Battery storage ยท BT Castro Storage, LLC |
50.5 MW | Withdrawn / abandoned |
| Avocado Falls Battery storage |
50.3 MW | Withdrawn / abandoned |
| Battery storage project J1695, Perry County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar project 184, Orangeburg County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project GEN-2023-029, Mayes County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project GEN-2023-121, Cowley County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project 532, Chickasaw County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Battery storage project BHCT G47, Fremont County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Vernal 2 Solar |
50.0 MW | Withdrawn / abandoned |
| Battery storage project IC-1155, Chatham County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project GEN-2023-070, Atoka County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project IA-PNM-2023-17, Valencia County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Watson Storage System #2 Battery storage ยท Watson Storage LLC |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project BHCT G44, Otero County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Battery storage project SP109, Coconino County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar project 99, Hillsborough County Solar |
50.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Battery storage project 221, Sumter County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Watson Storage System #1 Battery storage ยท Watson Storage LLC |
50.0 MW | Withdrawn / abandoned |
| Porter Energy Storage Battery storage ยท BPUS Generation Development LLC |
50.0 MW | Withdrawn / abandoned |
| Solar project 917965, Darlington County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project 554, Bradford County Solar ยท FPL |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project IA-PNM-2023-32, Santa Fe County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Solar project 915771, Darlington County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project 915755, Bladen County Solar |
50.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2023-SR15, Choctaw County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar project 915767, Darlington County Solar |
50.0 MW | Withdrawn / abandoned |
| Battery storage project 448, Yellowstone County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Battery storage project 557, Dickson County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2023-207, Bryan County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar project 214, Chesterfield County Solar |
49.9 MW | Withdrawn / abandoned |
| Battery storage project 900495, Durham County Battery storage |
49.9 MW | Withdrawn / abandoned |
| Solar project 920715, Duplin County Solar |
49.9 MW | Withdrawn / abandoned |
| Solar project 216, Kershaw County Solar |
49.9 MW | Withdrawn / abandoned |
| Solar + storage project C3-141, Iron County Solar + storage |
49.9 MW | Withdrawn / abandoned |
| Battery storage project C3-190, Multnomah County Battery storage |
49.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 ยท 198.6 GW
- West (non-ISO utilities)547 ยท 166.5 GW
- SPP (Southwest Power Pool)336 ยท 71.5 GW
- NYISO (New York)138 ยท 40.7 GW
- Southeast (non-ISO utilities)331 ยท 40.7 GW
- ERCOT (Texas)85 ยท 16.1 GW
- ISO-NE (New England)119 ยท 15.7 GW
- MISO (Midcontinent)10 ยท 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 ยท 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)