United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
BATTERY STORAGE Β· SOUTHEASTBattery storage project 900495, Durham County
Battery storage project 900495, Durham County is a 49.9 MW battery storage request withdrawn in the Southeast interconnection queue, in Durham County, North Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 900495
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Geer Wh 100 kV
- Location
- Durham County, North Carolina
- Technology
- Battery: 49.9 MW
- Total requested
- 49.9 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 June 2023
Location
Marker shows the centre of Durham County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Durham County
- Battery storage project 977296, Durham CountyBattery storage Β· 199 MW Β· in study
- Other project PP00040, Durham CountyOther Β· 150 MW Β· in study
- Other project 977263, Durham CountyOther Β· 150 MW Β· in study
- Solar project 977895, Durham CountySolar Β· 5.0 MW Β· in study
- Battery storage project 186310, Durham CountyBattery storage Β· 23.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem