BATTERY STORAGE Β· SPPBattery storage project GEN-2023-207, Bryan County
Battery storage project GEN-2023-207, Bryan County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Bryan County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-207
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Colbert 138 kV Substation
- Location
- Bryan County, Oklahoma
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2029
- Withdrawn
- March 2024
Location
Marker shows the centre of Bryan County; the queue data does not give exact sites.
Other requests in Bryan County
- Battery storage project GEN-2021-001, Bryan CountyBattery storage Β· 100 MW Β· agreement signed
- Solar project GEN-2017-232, Bryan CountySolar Β· 52.2 MW Β· agreement signed
- Solar + storage project GEN-2024-267, Bryan CountySolar + storage Β· 195 MW Β· in study
- Battery storage project GEN-2022-136, Bryan CountyBattery storage Β· 180 MW Β· in study
- Solar project GEN-2022-104, Bryan CountySolar Β· 113 MW Β· in study
- Battery storage project GEN-2024-204, Bryan CountyBattery storage Β· 100 MW Β· in study
- Battery storage project GEN-2024-SR13, Bryan CountyBattery storage Β· 52.2 MW Β· in study
- Gas project GEN-2017-043, Bryan CountyGas Β· 1,550 MW Β· withdrawn
- Gas project GEN-2017-042, Bryan CountyGas Β· 1,100 MW Β· withdrawn
- Gas project GEN-2019-034, Bryan CountyGas Β· 120 MW Β· withdrawn
- Battery storage project GEN-2023-214, Bryan CountyBattery storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem