SOLAR + STORAGE · SPPSolar + storage project GEN-2024-267, Bryan County
Solar + storage project GEN-2024-267, Bryan County is a 195 MW solar + storage request in interconnection study in the SPP interconnection queue, in Bryan County, Oklahoma, connecting to WFEC.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-267
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Durantp4 - Sclmnjc4 138 kV Line
- Location
- Bryan County, Oklahoma
- Technology
- Solar: 195 MW · Battery
- Total requested
- 195 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- March 2029
Location
Marker shows the centre of Bryan County; the queue data does not give exact sites.
Other requests in Bryan County
- Battery storage project GEN-2021-001, Bryan CountyBattery storage · 100 MW · agreement signed
- Solar project GEN-2017-232, Bryan CountySolar · 52.2 MW · agreement signed
- Battery storage project GEN-2022-136, Bryan CountyBattery storage · 180 MW · in study
- Solar project GEN-2022-104, Bryan CountySolar · 113 MW · in study
- Battery storage project GEN-2024-204, Bryan CountyBattery storage · 100 MW · in study
- Battery storage project GEN-2024-SR13, Bryan CountyBattery storage · 52.2 MW · in study
- Gas project GEN-2017-043, Bryan CountyGas · 1,550 MW · withdrawn
- Gas project GEN-2017-042, Bryan CountyGas · 1,100 MW · withdrawn
- Gas project GEN-2019-034, Bryan CountyGas · 120 MW · withdrawn
- Battery storage project GEN-2023-214, Bryan CountyBattery storage · 100 MW · withdrawn
- Battery storage project GEN-2023-207, Bryan CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem