United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR + STORAGE Β· WEST

Solar + storage project BHCT G44, Otero County

Solar + storage project BHCT G44, Otero County is a 50.0 MW solar + storage request withdrawn in the West interconnection queue, in Otero County, Colorado, connecting to Black Hills Colorado Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHCT G44
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Colorado Electric
Connection point (POI)
South Fowler 115 kV Substation
Location
Otero County, Colorado
Technology
Solar: 50.0 MW Β· Battery
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
26 June 2023
Proposed online date
June 2027

Location

Marker shows the centre of Otero County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Otero County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem