United States βΊ Grid βΊ Interconnection queues βΊ Colorado
SOLAR + STORAGE Β· WESTSolar + storage project BHCT G44, Otero County
Solar + storage project BHCT G44, Otero County is a 50.0 MW solar + storage request withdrawn in the West interconnection queue, in Otero County, Colorado, connecting to Black Hills Colorado Electric.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- BHCT G44
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Black Hills Colorado Electric
- Connection point (POI)
- South Fowler 115 kV Substation
- Location
- Otero County, Colorado
- Technology
- Solar: 50.0 MW Β· Battery
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 26 June 2023
- Proposed online date
- June 2027
Location
Marker shows the centre of Otero County; the queue data does not give exact sites.
Other requests in Otero County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem