Solar + storage project BHCT G39, Otero County

Solar + storage project BHCT G39, Otero County is a 40.0 MW solar + storage request withdrawn in the West interconnection queue, in Otero County, Colorado, connecting to Black Hills Colorado Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHCT G39
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Colorado Electric
Connection point (POI)
LaJunta 115 kV Substation
Location
Otero County, Colorado
Technology
Solar: 40.0 MW Β· Battery
Total requested
40.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
23 September 2022
Proposed online date
December 2025

Location

Marker shows the centre of Otero County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Otero County