BATTERY STORAGE Β· MISOBattery storage project J1695, Perry County
Battery storage project J1695, Perry County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Perry County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2023 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1695
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Aster 138kV Substation (Rebuild of North Coulterville 138kV)
- Location
- Perry County, Illinois
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 December 2023
- Proposed online date
- September 2023
- Withdrawn
- September 2024
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Other requests in Perry County
- Solar project J1306, Perry CountySolar Β· 200 MW Β· agreement signed
- Other project J2171, Perry CountyOther Β· 500 MW Β· in study
- Solar project J1712, Perry CountySolar Β· 300 MW Β· in study
- Surplus; J1712Battery storage Β· 200 MW Β· in study
- Solar project J3064, Perry CountySolar Β· 157 MW Β· in study
- Solar project J3306, Perry CountySolar Β· 150 MW Β· in study
- Battery storage project J3063, Perry CountyBattery storage Β· 143 MW Β· in study
- Solar project J1777, Perry CountySolar Β· 100 MW Β· in study
- SurplusBattery storage Β· 100 MW Β· in study
- Solar project J2626, Perry CountySolar Β· 300 MW Β· withdrawn
- Solar project J3135, Perry CountySolar Β· 200 MW Β· withdrawn
- Solar project J3060, Perry CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem