Porter Energy Storage

Porter Energy Storage is a 50.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Essex County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1621
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
BPUS Generation Development LLC
Connection point (POI)
115kV Hague Road Substation
Location
Essex County, New York
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Queue status
Withdrawn
Entered queue
12 October 2023

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Essex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem