BATTERY STORAGE · NYISOPorter Energy Storage
Porter Energy Storage is a 50.0 MW battery storage request in interconnection study in the NYISO interconnection queue, in Essex County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Sep 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-163
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- BGTF US Development Holdings LLC
- Connection point (POI)
- Hague Road to Ticonderoga 115 kV line 4
- Location
- Essex County, New York
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Queue status
- Active
- Entered queue
- 15 September 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Other requests in Essex County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem