United States › Grid › Interconnection queues › New York

SOLAR + STORAGE · NYISO

Crown Point Solar

Crown Point Solar is a 20.0 MW solar + storage request withdrawn in the NYISO interconnection queue, in Essex County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1661
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Crown Point Solar LLC
Connection point (POI)
115kV Line #2 between Ticonderoga substation and Republic substation
Location
Essex County, New York
Technology
Solar: 20.0 MW · Battery
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
28 December 2023

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Essex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem