SOLAR Β· WESTSolar project GI-2023-13, Garfield County
Solar project GI-2023-13, Garfield County is a 52.0 MW solar request withdrawn in the West interconnection queue, in Garfield County, Colorado, connecting to Public Service Company Of Colorado.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-2023-13
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Public Service Company Of Colorado
- Connection point (POI)
- Rifle-Collbran kV Line
- Location
- Garfield County, Colorado
- Technology
- Solar: 52.0 MW
- Total requested
- 52.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Detailed status: Withdrawn 10/02/2023
- Queue status
- Withdrawn
- Entered queue
- 22 May 2023
- Proposed online date
- December 2026
- Withdrawn
- October 2023
Location
Marker shows the centre of Garfield County; the queue data does not give exact sites.
Other requests in Garfield County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem