United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
BATTERY STORAGE Β· SOUTHEASTBattery storage project 557, Dickson County
Battery storage project 557, Dickson County is a 50.0 MW battery storage request withdrawn in the Southeast interconnection queue, in Dickson County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 557
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Dickson County, Tennessee
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Queue status
- Withdrawn
- Entered queue
- 31 May 2023
- Proposed online date
- August 2026
Location
Marker shows the centre of Dickson County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Dickson County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem