🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas — page 27

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,486351.5 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,486 requests · page 27 of 30
ProjectCapacityStatusLocationRegionQueuedOnline
Demeter Solar
Solar + storage · Demeter Solar, LLC
88.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
Bandana Solar SLF
Solar
86.9 MWPaused / redesign Jim Wells, TXERCOT Apr 2025
Ratcliff Solar
Solar · Greenalia Solar Power Ratcliff
85.7 MWIn study Freestone, TXERCOT Jun 2022target 2029
RedSun BESS
Solar + storage · Gransolar Texas Twenty Two
84.0 MWIn study Burnet, TXERCOT Dec 2023target 2027
Lupinus Storage 1
Solar + storage · Lupinus Solar, LLC
84.0 MWIn study Franklin, TXERCOT Dec 2021target 2027
FLIFER Solar I
Solar · FLIFER LLC
84.0 MWIn study Ward, TXERCOT Mar 2023target 2027
Billie Storage
Battery storage · Weslaco Storage LLC
83.8 MWIn study Hidalgo, TXERCOT Jul 2024target 2029
Galaxy I Solar
Solar + storage · Galaxy Solar, LLC
82.9 MWIn study Ellis, TXERCOT Apr 2025target 2028
Harper Energy Storage
Battery storage · VESI 31 LLC
82.4 MWIn study Cameron, TXERCOT Dec 2021target 2028
M-Bar BESS I
Solar + storage · M-Bar Energy I, LLC
82.1 MWIn study Ector, TXERCOT Dec 2024target 2028
Proving Ground Solar
Solar + storage · Lantana Solar LLC
82.1 MWIn study Schleicher, TXERCOT Jul 2023target 2028
Hector Solar
Solar + storage · Hector Solar, LLC
81.6 MWIn study Navarro, TXERCOT Oct 2022target 2027
Stegall Solar
Solar + storage · BT Martin Solar, LLC
81.6 MWIn study Robertson, TXERCOT Aug 2023target 2027
Sunbelt Solar
Solar + storage · Rose Hill Solar LLC
81.5 MWIn study Kaufman, TXERCOT Mar 2021target 2026
Soluce Bravo Solar
Solar + storage · BNPB1, LLC
80.5 MWIn study Brown, TXERCOT Jan 2025target 2028
Juniperusss
Solar + storage · BLUE STONE RENEWABLE XXI LLC
80.3 MWIn study Hopkins, TXERCOT Jan 2024target 2029
Backwater Solar
Solar
80.0 MWPaused / redesign Cooke, TXERCOT Aug 2021target 2024
Becard Solar
Solar
80.0 MWPaused / redesign Ellis, TXERCOT
Hinkell BESS
Battery storage · Reveille BESS
78.1 MWIn study La Salle, TXERCOT Aug 2023target 2027
Naduah Solar
Solar · Gransolar Texas Fifteen, LLC
77.6 MWIn study Limestone, TXERCOT Sep 2021target 2027
Cairos Storage
Solar + storage · Cairos Solar, LLC
77.3 MWIn study Kinney, TXERCOT Oct 2023target 2026
Dionysus Storage
Solar + storage · Dionysus Solar, LLC
77.3 MWIn study Houston, TXERCOT Jun 2023target 2027
Knox County Moore Storage
Battery storage · DM-KCM, LLC
77.0 MWIn study Knox, TXERCOT Dec 2024target 2028
Lytton Springs BESS
Solar + storage · SMT Lytton Springs LLC
76.4 MWIn study Caldwell, TXERCOT Dec 2025target 2027
Eytcheson Ranches Solar
Solar · Gransolar Texas Fourteen, LLC
76.4 MWIn study Navarro, TXERCOT Sep 2021target 2028
Serengeti Solar
Solar · Abei Energy Green XIV LLC
76.2 MWIn study Delta, TXERCOT Dec 2022target 2028
Myers Storage
Solar + storage · BT Myers Solar, LLC
76.0 MWIn study Bee, TXERCOT Jun 2023target 2028
Donelson Solar SLF
Solar + storage · Donelson Solar
75.4 MWIn study Red River, TXERCOT Mar 2025target 2028
PaleAle BESS
Battery storage · Momentum Energy Storage Partners,LLC
75.4 MWIn study Hays, TXERCOT Jul 2022target 2027
Lytton Springs Solar
Solar + storage · SMT Lytton Springs LLC
75.3 MWIn study Caldwell, TXERCOT Dec 2025target 2027
East Blackland Battery Storage SLF
Solar + storage · DERIVA ENERGY STORAGE, LLC
75.0 MWIn study Travis, TXERCOT Nov 2022target 2028
Noria Storage
Battery storage
75.0 MWPaused / redesign Nueces, TXERCOT Aug 2020target 2025
Solar + storage project GEN-2024-071, Cass County
Solar + storage
75.0 MWIn study Cass, TXSPP Oct 2024target 2027
Proteus Vernon Solar SLF
Solar + storage · Vernon Solar and Storage LLC (a Delaware LLC)
75.0 MWIn study Wilbarger, TXERCOT Mar 2023target 2028
Photo BESS 1
Solar + storage · CED Development Inc.
75.0 MWIn study Uvalde, TXERCOT Oct 2021target 2027
French Riviera Storage
Battery storage · Arana Creek Battery Storage LLC
75.0 MWIn study Kleberg, TXERCOT Feb 2023target 2028
Valdivian Solar
Solar · Abei Energy Green III LLC
74.9 MWIn study Hunt, TXERCOT Feb 2023target 2028
Sunbeam Solar
Solar · Buckeye Midway Solar
74.4 MWIn study San Patricio, TXERCOT Oct 2024target 2028
Owego Solar
Solar · Hecate Energy
74.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Umbra (Stockyard) BESS
Battery storage
73.0 MWPaused / redesign Franklin, TXERCOT Jan 2021
Sullivan BESS
Solar + storage · Sullivan Solar LLC
72.2 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Texas Sun Solar
Solar · Pigg Grounds LLC
71.7 MWIn study Jackson, TXERCOT Sep 2025target 2027
7L Solar SLF
Solar + storage · 7L Solar, LLC
71.6 MWIn study Dimmit, TXERCOT Sep 2025target 2029
Pato Blanco Storage
Battery storage · TX BESS 4, LLC
71.3 MWIn study Fort Bend, TXERCOT May 2023target 2026
Edens Solar
Solar · Hill PV, LLC
70.4 MWIn study Hill, TXERCOT Oct 2023target 2027
Venture Hill Storage
Battery storage · KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Kildare
Solar · Galsol, LLC
70.0 MWIn study Jackson, TXERCOT Jan 2022target 2026
Creekfield Storage
Battery storage
69.0 MWPaused / redesign Fort Bend, TXERCOT Nov 2020
Onshore wind project GEN-2025-SR2, Hansford County
Onshore wind
67.2 MWIn study Hansford, TXSPP May 2025target 2028
Symank Solar
Solar · BT Symank Solar, LLC
66.6 MWIn study Bosque, TXERCOT Nov 2024target 2027
Page 27 of 30

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)