🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in ERCOT (Texas) — page 24

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,408328.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,408 requests · page 24 of 29
ProjectCapacityStatusLocationRegionQueuedOnline
Hondo Arroyo Storage
Solar + storage · Hondo Creek Solar, LLC
101 MWIn study Medina, TXERCOT Dec 2024target 2028
Calf Creek Storage
Battery storage · Coyote Ridge Storage, LLC
101 MWIn study Howard, TXERCOT Nov 2025target 2028
Dolce BESS
Battery storage · Dolce BESS, LLC
101 MWIn study Mitchell, TXERCOT Sep 2022target 2028
Holstein 2 Solar
Solar + storage · 229HD 8me LLC
101 MWIn study Nolan, TXERCOT Dec 2016target 2028
Goat Mountain BESS 2
Wind + storage · Goat Wind LLC
101 MWIn study Sterling, TXERCOT Jan 2025target 2027
Brahman Renewables Solar
Solar + storage · Brahman Renewables
101 MWIn study Milam, TXERCOT Oct 2024target 2029
Ringtail Ridge Storage
Battery storage · KCE TX 26, LLC
101 MWIn study Kendall, TXERCOT Jan 2021target 2028
Echols Creek Storage
Other · BT Ferguson Solar, LLC
101 MWPaused / redesign Lamar, TXERCOT Apr 2023target 2027
Lemma Solar
Solar · Greening USA Corp.
101 MWIn study Knox, TXERCOT Apr 2023target 2028
San Bernard Storage
Other · San Bernard Storage, LLC
101 MWPaused / redesign Wharton, TXERCOT Nov 2019target 2022
Mobee Springs BESS
Battery storage · Mobee Springs, LLC
101 MWIn study Refugio, TXERCOT Jun 2025target 2028
Musgravite Solar
Solar · BT Thompson Solar, LLC
101 MWIn study Henderson, TXERCOT Mar 2024target 2027
Sugarloaf BESS
Battery storage · Sugarloaf Clean Energy LLC
101 MWIn study Dimmit, TXERCOT Mar 2024target 2028
Sagewood BESS
Battery storage · Sagewood BESS, LLC
101 MWIn study Glasscock, TXERCOT Sep 2022target 2028
Felix Storage
Solar + storage · Felix 1, LLC
101 MWIn study Wilbarger, TXERCOT Jan 2023target 2027
Timber Cove Solar SLF
Solar + storage · Freestone Solar, LLC
101 MWIn study Freestone, TXERCOT May 2023target 2027
Triangle Ranch Echo
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Triangle Ranch Fox
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Mud Cat Solar SLF
Solar + storage · Mud Cat Solar, LLC
101 MWIn study Lamar, TXERCOT Oct 2023target 2027
Timberline Storage
Solar + storage · Timberline Renewables, LLC
101 MWIn study Nacogdoches, TXERCOT Aug 2023target 2029
BRP Musca BESS
Battery storage · BRP Musca BESS LLC
101 MWIn study Reagan, TXERCOT Jul 2020target 2027
AP Greenport
Battery storage · AP Greenport
101 MWIn study Travis, TXERCOT Jun 2022target 2027
Wizard Ranch Solar
Solar
101 MWPaused / redesign Jack, TXERCOT May 2023
Guinness BESS
Battery storage · Momentum Energy Storage Partners,LLC
101 MWIn study Williamson, TXERCOT Jul 2022target 2027
Firefly Fields Solar
Solar + storage · Firefly Fields Energy Center LLC
101 MWIn study Colorado, TXERCOT Jan 2025target 2028
Lazy Frog Solar SLF
Solar + storage · Lazy Frog Solar, LLC
100 MWIn study Franklin, TXERCOT Sep 2023target 2028
Goldfinch Storage
Solar + storage · BT DJ4M Solar, LLC
100 MWIn study Van Zandt, TXERCOT Oct 2023target 2028
Main Horn Solar
Solar · Main Horn Solar LLC
100 MWIn study Navarro, TXERCOT target 2028
Cobra Clean Energy Center
Battery storage · Cobra Clean Energy Center LLC
100 MWIn study Brazoria, TXERCOT Feb 2024target 2027
Firebird Solar
Solar
100 MWPaused / redesign Ector, TXERCOT Nov 2023target 2026
Jim Wells BESS
Battery storage · Jim Wells ESS
100 MWIn study Jim Wells, TXERCOT Feb 2024target 2028
Pledgor BESS
Battery storage · Pledgor BESS
100 MWIn study Matagorda, TXERCOT May 2023target 2028
Rogers Creek BESS
Battery storage · Dialville BESS
100 MWIn study Cherokee, TXERCOT May 2023target 2028
Diamond Sage BESS 2
Solar + storage · DGC Renewables, LLC
100 MWIn study Webb, TXERCOT Jan 2025target 2028
Diamond Sage BESS 1
Solar + storage · DGC Renewables, LLC
100 MWIn study Webb, TXERCOT Jan 2025target 2028
Coleto Creek ESS Addition
Battery storage
100 MWPaused / redesign Goliad, TXERCOT Dec 2019
Ardesia Storage
Battery storage · Ardesia Storage Project LLC
100 MWIn study Caldwell, TXERCOT Jun 2022target 2027
Independence Trail Storage
Battery storage · KCE TX 16, LLC
100 MWIn study Childress, TXERCOT Dec 2019target 2028
Callisto ID Energy Center
Battery storage · Tempus Power management LLC
100 MWIn study Harris, TXERCOT Oct 2024target 2026
Palmvalley Storage
Battery storage
100 MWPaused / redesign Hidalgo, TXERCOT Sep 2022target 2025
PSE Richardson TX Storage
Battery storage · PureSky Development Inc.
100 MWIn study Hidalgo, TXERCOT Dec 2022target 2027
Photo BESS 3
Solar + storage · CED Development Inc.
100 MWIn study Uvalde, TXERCOT Jul 2022target 2027
Erika BESS
Solar + storage · Erika Solar, LLC
100 MWIn study Kaufman, TXERCOT Jun 2025target 2029
Galvanic BESS
Battery storage · CED Development Inc
100 MWIn study Kinney, TXERCOT Feb 2021target 2027
Radiant Plains Energy Center Solar
Solar + storage · Adapture Solar Development
100 MWIn study Colorado, TXERCOT Jun 2025target 2029
San Bernard Solar
Solar · Sunchase Power
100 MWPaused / redesign Wharton, TXERCOT Jan 2017target 2022
SPC Bloom BESS
Battery storage · BRP Blue Topaz 2, LLC
100 MWIn study Victoria, TXERCOT Dec 2020target 2027
IEP Blackhawk
Battery storage · IEP Texas Verde II, llc
100 MWIn study Galveston, TXERCOT Apr 2023target 2026
Backwater Storage
Battery storage
100 MWPaused / redesign Cooke, TXERCOT Sep 2021
Radiant Plains Energy Center BESS
Solar + storage · Adapture Solar Development
100 MWIn study Colorado, TXERCOT Jun 2025target 2029
Page 24 of 29

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)