United States › Grid › Interconnection queues › Tennessee

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Tennessee — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5313.8 GW
Active in queue13.8 GW53 requests
Agreement signed3,482 MW24 requests
Withdrawn243104.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

53 requests · page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Nuclear project 471, Hamilton County
Nuclear
6.0 MWAgreement signed Hamilton, TNSoutheast Mar 2021target 2026
Hydro project 659, Loudon County
Hydro
4.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Hydro project 658, Loudon County
Hydro
3.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)