Interconnection queue in ERCOT (Texas) — page 11

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 11 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Shepard Energy Storage
Battery storage · Shepard Energy Storage LLC
257 MWAgreement signed Galveston, TXERCOT Dec 2022target 2027
Saddlehorn Energy Storage
Battery storage · Saddlehorn, LLC
257 MWIn study Austin, TXERCOT Nov 2024target 2028
Van Zandt Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
257 MWIn study Ector, TXERCOT Jun 2023target 2027
Shamrock II Wind
Onshore wind
257 MWPaused / redesign Crockett, TXERCOT Jul 2023target 2028
Alila Solar
Solar + storage · Electra Energy Project, LLC
257 MWAgreement signed San Patricio, TXERCOT Oct 2020target 2028
Rex Storage
Battery storage · Rex BESS, LLC
256 MWIn study Harris, TXERCOT Jun 2024target 2027
Bell County Morgan Storage
Battery storage · DM-BCTRM, LLC
256 MWIn study Bell, TXERCOT Nov 2024target 2028
Sunburst BESS
Solar + storage · Indigo Solar, LLC
256 MWIn study San Patricio, TXERCOT Oct 2024target 2029
Hastings Park BESS
Battery storage · Brazos Roots BESS, LLC
256 MWAgreement signed Brazoria, TXERCOT Aug 2024target 2027
SanPat Solar II
Solar · CGRP 04, LLC
256 MWAgreement signed San Patricio, TXERCOT Feb 2022target 2027
Nautilus Heavy Storage
Battery storage · Nautilus Heavy Storage, LLC
256 MWIn study San Patricio, TXERCOT Dec 2023target 2028
Tulsita Solar
Solar · Ray Ranch Solar LLC
256 MWAgreement signed Goliad, TXERCOT Dec 2018target 2026
Leaning Tree BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Maleza Storage II
Battery storage · Brush Storage, LLC
256 MWIn study Wharton, TXERCOT Feb 2024target 2027
Lonesome Dove BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Champs Elysees BESS
Battery storage · Champs Elysees Renewables, LLC
256 MWIn study Milam, TXERCOT Aug 2024target 2027
Nouveau BESS
Battery storage · RamZ BESS, LLC
256 MWIn study Brown, TXERCOT Aug 2024target 2027
Bayou Creek Solar
Solar · Ferrovial Energy US 1
256 MWIn study San Patricio, TXERCOT Dec 2024target 2028
Zeya BESS
Battery storage · BRP Zeya BESS LLC
255 MWAgreement signed Galveston, TXERCOT May 2021target 2026
Sierra Madre Solar
Solar · Sierra Madre Solar LLC
255 MWIn study Zapata, TXERCOT Jan 2020target 2027
San Gabriel Solar
Solar + storage · San Gabriel Solar LLC
255 MWIn study Milam, TXERCOT Jan 2025target 2028
Maleza Solar
Solar + storage · Brush Solar LLC
255 MWAgreement signed Wharton, TXERCOT Dec 2018target 2027
Maleza Solar II
Solar + storage · Brush Solar, LLC
255 MWIn study Wharton, TXERCOT Apr 2021target 2027
PowerVault BESS
Battery storage · SMT Elm Mott BESS
255 MWIn study Mclennan, TXERCOT Mar 2024target 2027
Railway BESS
Battery storage
255 MWPaused / redesign Rusk, TXERCOT Jan 2023target 2026
Staked Plains BESS
Battery storage
255 MWPaused / redesign Lubbock, TXERCOT Mar 2023target 2026
Roseland Solar
Solar · Enel Green Power Roseland Solar, LLC
254 MWAgreement signed Falls, TXERCOT Nov 2018target 2025
Roseland Solar II
Solar · Enel Green Power Roseland Solar, LLC
254 MWAgreement signed Falls, TXERCOT Oct 2021target 2025
Grand Mesa BESS
Battery storage · PERRY GREEN POWER LLC
253 MWIn study Pecos, TXERCOT Aug 2024target 2027
Collier Ranch Solar
Solar
253 MWPaused / redesign Motley, TXERCOT Feb 2024
Armstrong Wind
Onshore wind · Big Sky Energy
253 MWPaused / redesign Armstrong, TXERCOT May 2016target 2020
Bayside II Solar
Solar
253 MWPaused / redesign Dewitt, TXERCOT Jul 2021target 2026
Tall Saddle Solar
Solar · Tall Saddle Solar, LLC
252 MWIn study Kenedy, TXERCOT Jul 2024target 2029
Bayside 2 BESS
Battery storage
252 MWPaused / redesign Dewitt, TXERCOT Mar 2022
Cibeles Solar
Solar · Elawan Cibeles Solar, LLC
252 MWAgreement signed Mclennan, TXERCOT May 2022target 2027
Lazy U Solar 2
Solar · Lazy U Solar 2
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Pandora Solar
Solar
252 MWPaused / redesign Wilson, TXERCOT Jan 2020
Little Ridge Storage
Battery storage · TX BESS B LLC
252 MWIn study Collin, TXERCOT May 2023target 2025
Buzios Solar
Solar + storage · Roaring Springs Solar, LLC
252 MWAgreement signed Motley, TXERCOT Sep 2022target 2026
Lazy U Solar 1
Solar · Lazy U Solar 1
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Eval Storage
Battery storage · Hecate Grid East Valley Storage LLC
252 MWAgreement signed Cameron, TXERCOT Oct 2020target 2028
Straight Spur Solar
Solar + storage · ENGIE IR Holdings LLC
252 MWIn study Andrews, TXERCOT Nov 2024target 2029
Clairemont Solar 1
Solar · Clairemont Solar LLC
252 MWAgreement signed Kent, TXERCOT Jan 2025target 2029
Velociraptor Solar II
Solar + storage · Greyhound Solar 3 LLC
252 MWIn study Ector, TXERCOT May 2025target 2028
Velociraptor Solar I
Solar + storage · Greyhound Solar 2
252 MWIn study Ector, TXERCOT May 2019target 2028
Ogalalla Storage
Battery storage · Hecate Energy Ogalalla Solar LLC
252 MWIn study Castro, TXERCOT Jan 2024target 2028
Paint Brush PV2
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2028
Juniper Ridge BESS 2
Battery storage · Lazy U ESS 2
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Paint Brush PV3
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2029
Cowboy Power Gas Plant
Gas · Vaquero Power, LLC
252 MWIn study San Patricio, TXERCOT Aug 2025target 2028
Page 11 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)