United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Shepard Energy Storage Battery storage · Shepard Energy Storage LLC |
257 MW | Agreement signed |
| Saddlehorn Energy Storage Battery storage · Saddlehorn, LLC |
257 MW | In study |
| Van Zandt Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
257 MW | In study |
| Shamrock II Wind Onshore wind |
257 MW | Paused / redesign |
| Alila Solar Solar + storage · Electra Energy Project, LLC |
257 MW | Agreement signed |
| Rex Storage Battery storage · Rex BESS, LLC |
256 MW | In study |
| Bell County Morgan Storage Battery storage · DM-BCTRM, LLC |
256 MW | In study |
| Sunburst BESS Solar + storage · Indigo Solar, LLC |
256 MW | In study |
| Hastings Park BESS Battery storage · Brazos Roots BESS, LLC |
256 MW | Agreement signed |
| SanPat Solar II Solar · CGRP 04, LLC |
256 MW | Agreement signed |
| Nautilus Heavy Storage Battery storage · Nautilus Heavy Storage, LLC |
256 MW | In study |
| Tulsita Solar Solar · Ray Ranch Solar LLC |
256 MW | Agreement signed |
| Leaning Tree BESS Battery storage |
256 MW | Paused / redesign |
| Maleza Storage II Battery storage · Brush Storage, LLC |
256 MW | In study |
| Lonesome Dove BESS Battery storage |
256 MW | Paused / redesign |
| Champs Elysees BESS Battery storage · Champs Elysees Renewables, LLC |
256 MW | In study |
| Nouveau BESS Battery storage · RamZ BESS, LLC |
256 MW | In study |
| Bayou Creek Solar Solar · Ferrovial Energy US 1 |
256 MW | In study |
| Zeya BESS Battery storage · BRP Zeya BESS LLC |
255 MW | Agreement signed |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Maleza Solar Solar + storage · Brush Solar LLC |
255 MW | Agreement signed |
| Maleza Solar II Solar + storage · Brush Solar, LLC |
255 MW | In study |
| PowerVault BESS Battery storage · SMT Elm Mott BESS |
255 MW | In study |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Roseland Solar Solar · Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Roseland Solar II Solar · Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Grand Mesa BESS Battery storage · PERRY GREEN POWER LLC |
253 MW | In study |
| Collier Ranch Solar Solar |
253 MW | Paused / redesign |
| Armstrong Wind Onshore wind · Big Sky Energy |
253 MW | Paused / redesign |
| Bayside II Solar Solar |
253 MW | Paused / redesign |
| Tall Saddle Solar Solar · Tall Saddle Solar, LLC |
252 MW | In study |
| Bayside 2 BESS Battery storage |
252 MW | Paused / redesign |
| Cibeles Solar Solar · Elawan Cibeles Solar, LLC |
252 MW | Agreement signed |
| Lazy U Solar 2 Solar · Lazy U Solar 2 |
252 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Little Ridge Storage Battery storage · TX BESS B LLC |
252 MW | In study |
| Buzios Solar Solar + storage · Roaring Springs Solar, LLC |
252 MW | Agreement signed |
| Lazy U Solar 1 Solar · Lazy U Solar 1 |
252 MW | In study |
| Eval Storage Battery storage · Hecate Grid East Valley Storage LLC |
252 MW | Agreement signed |
| Straight Spur Solar Solar + storage · ENGIE IR Holdings LLC |
252 MW | In study |
| Clairemont Solar 1 Solar · Clairemont Solar LLC |
252 MW | Agreement signed |
| Velociraptor Solar II Solar + storage · Greyhound Solar 3 LLC |
252 MW | In study |
| Velociraptor Solar I Solar + storage · Greyhound Solar 2 |
252 MW | In study |
| Ogalalla Storage Battery storage · Hecate Energy Ogalalla Solar LLC |
252 MW | In study |
| Paint Brush PV2 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Juniper Ridge BESS 2 Battery storage · Lazy U ESS 2 |
252 MW | In study |
| Paint Brush PV3 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Cowboy Power Gas Plant Gas · Vaquero Power, LLC |
252 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)