United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) — page 10

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 10 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Grapefruit Solar
Solar · Grapefruit Solar LLC
291 MWAgreement signed Hidalgo, TXERCOT Feb 2024target 2028
Vista Bluff Wind 2
Onshore wind
290 MWPaused / redesign Upton, TXERCOT Sep 2024
Vista Bluff Wind 1
Onshore wind
290 MWPaused / redesign Upton, TXERCOT Sep 2024
Vista Bluff Wind II "Alternate POI"
Onshore wind · Vista Bluff Windpower, LLC
290 MWIn study Upton, TXERCOT Sep 2025target 2029
Vista Bluff Wind I "Alternate POI"
Onshore wind · Vista Bluff Windpower, LLC
290 MWIn study Upton, TXERCOT Sep 2025target 2029
Tres Rios Ranch BESS
Solar + storage · LectricWind LLC
290 MWIn study Upton, TXERCOT May 2023target 2027
Shifting Gale Wind
Onshore wind
289 MWPaused / redesign Castro, TXERCOT Apr 2018target 2025
Sandow Solar
Solar · Sandow Lakes Ranch Solar I, LLC
287 MWIn study Milam, TXERCOT Sep 2020target 2028
Baker Branch BESS
Battery storage · Mockingbird Storage Center, LLC
287 MWIn study Lamar, TXERCOT Jun 2025target 2029
Inadale BESS
Solar + storage · Inadale BESS, LLC
287 MWIn study Scurry, TXERCOT Feb 2023target 2028
Spindletop Solar
Solar + storage · Banita Creek Solar LLC
286 MWAgreement signed Nacogdoches, TXERCOT Jul 2024target 2027
Fierce River BESS
Solar + storage · Rio Grande Solar LLC
285 MWIn study Starr, TXERCOT Mar 2024target 2029
Monarch Creek Wind
Onshore wind · MONARCH CREEK WIND, LLC
284 MWAgreement signed Throckmorton, TXERCOT Apr 2019target 2027
Fivemile Wind
Onshore wind · Longview Wind, LLC
282 MWIn study Dawson, TXERCOT Apr 2025target 2028
Impala Flats Wind
Onshore wind · Antelope Flats Wind, LLC
282 MWIn study Lynn, TXERCOT Jan 2019target 2026
Treehouse Solar
Solar + storage · Treehouse Solar, LLC
282 MWIn study Grimes, TXERCOT Jul 2025target 2028
Piedra Solar
Solar + storage · Piedra Solar, LLC
282 MWAgreement signed Freestone, TXERCOT Sep 2022target 2026
Jukebox Solar
Solar · ACE DevCo NC, LLC
281 MWIn study Frio, TXERCOT Jun 2025target 2027
Inadale Solar
Solar + storage · Inadale Solar, LLC
281 MWIn study Scurry, TXERCOT Feb 2023target 2028
Unicorn BESS
Battery storage · Unicorn Energies
279 MWIn study Fort Bend, TXERCOT Jan 2024target 2027
Crossroads Wind
Onshore wind · HyFuels Green Lake Wind LLC
277 MWAgreement signed Victoria, TXERCOT Sep 2022target 2027
Pease River Solar
Solar · Pease River Solar LLC
276 MWIn study Foard, TXERCOT Dec 2025target 2029
Blue Hills Wind
Onshore wind
276 MWPaused / redesign Val Verde, TXERCOT May 2019target 2026
Roboman Solar
Solar · Roboman Solar, LLC
273 MWIn study Coke, TXERCOT Jul 2025target 2029
Blevins Solar
Solar · Blevins Solar, LLC
272 MWAgreement signed Falls, TXERCOT Feb 2021target 2026
Foxtrot Wind
Onshore wind · Lincoln Clean
268 MWAgreement signed Bee, TXERCOT Jul 2018target 2026
Big Sampson Wind
Onshore wind · Big Sampson Wind Project, LLC
265 MWAgreement signed Crockett, TXERCOT May 2015target 2026
OCI SunRoper
Solar · OCI SunRoper LLC
265 MWAgreement signed Wharton, TXERCOT Nov 2021target 2027
Santa Garcias Solar
Solar · Oxy Renewable Energy LLC
265 MWIn study Kleberg, TXERCOT Jun 2023target 2028
Leopard BESS
Battery storage · Bobcat Energy Center, LLC
264 MWAgreement signed Victoria, TXERCOT May 2024target 2028
Possum Kingdom Solar
Solar + storage · PK Solar, LLC
262 MWIn study Jack, TXERCOT Sep 2021target 2027
Yellow Cat Wind
Onshore wind · Yellow Cat Wind LLC
262 MWAgreement signed Navarro, TXERCOT Aug 2021target 2027
Charolais Solar
Solar + storage · RWE Solar Development, LLC
262 MWIn study Matagorda, TXERCOT Aug 2019target 2026
Miranda Solar Project
Solar · Miranda Solar Project, LLC
261 MWAgreement signed Mcmullen, TXERCOT Nov 2021target 2027
Dundee East B Wind
Onshore wind · Felix 2, LLC
261 MWAgreement signed Baylor, TXERCOT Jan 2023target 2027
Velociraptor BESS II
Solar + storage · Greyhound BESS 3 LLC
261 MWIn study Ector, TXERCOT May 2025target 2028
Sypert Branch Solar Project
Solar · Sypert Branch Solar LLC
261 MWAgreement signed Milam, TXERCOT Sep 2021target 2026
Velociraptor BESS I
Solar + storage · Greyhound BESS 2 LLC
261 MWIn study Ector, TXERCOT May 2025target 2028
Verily Solar (FKA Cuello De Cuero Solar)
Solar · NextEra Energy Interconnection Holdings, LLC
261 MWIn study Brooks, TXERCOT Mar 2024target 2029
Panhandle Flagship Solar 3
Solar + storage · Panhandle Solar Group Operating Company LLC
260 MWAgreement signed Hutchinson, TXERCOT Mar 2023target 2027
Homestead Power (TEF-Due Diligence)
Gas · Homestead Power LLC
260 MWIn study Austin, TXERCOT Jul 2024target 2029
Ochoa Energy Storage
Battery storage · Ochoa Energy Storage LLC
260 MWIn study Waller, TXERCOT Apr 2023target 2027
Red Holly Solar
Solar + storage · GreenGo Energy
260 MWAgreement signed Dawson, TXERCOT Jul 2018target 2027
Jay Flat BESS
Battery storage · Jay Flat BESS LLC
259 MWIn study Kent, TXERCOT Jan 2025target 2029
Goodnight Wind II
Onshore wind · FGE Goodnight II, LLC
259 MWAgreement signed Armstrong, TXERCOT Apr 2023target 2027
Mystic Springs Renewable Energy Solar SLF
Solar + storage · Mystic Spring Renewable Energy LLC
259 MWAgreement signed Kaufman, TXERCOT May 2022target 2028
First Capitol BESS
Battery storage · First Capitol BESS, LLC
258 MWAgreement signed Brazoria, TXERCOT Oct 2023target 2027
Horsepower BESS
Battery storage · Horsepower BESS, LLC
258 MWIn study Bexar, TXERCOT Dec 2025target 2028
Drake BESS
Battery storage · Mallard Energy Storage LLC
257 MWAgreement signed Collin, TXERCOT Jun 2022target 2026
Masava Storage
Battery storage · Savannah Oaks Solar Project, LLC
257 MWIn study Madison, TXERCOT Sep 2022target 2028
Page 10 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)