NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown444102.5 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

444 projects · page 4 of 9
ProjectCapacityStageConnection siteFrom
Balrobert Farm BESS
Battery storage · Elgin Energy Es Co Limited
150 MWScoping Knocknagael 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
150 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Drum of Clunas Wind and Solar Park
Onshore wind · Broadhaven Distribution Limited
150 MWScoping Drum Of Clunas Wind 275Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
Galileo 07 Limited
Solar + storage · Galileo 07 Limited
150 MWScoping Galileo 07 Limited 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2032
Kedrum Solar Farm
Solar + storage · Rosside Energy Limited
150 MWAwaiting Consents Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
May 2030
Keith Solar Farm
Solar + storage · Keith Solar Pv Limited
150 MWScoping Keith Solar Farm 275kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Achrugan Wind Farm
Wind + storage · Statkraft Windco 1 Limited
149 MWScoping Achrugan 132kV Substation
SSEN Transmission (north Scotland)
Jul 2030
Ballach
Wind + storage · Energyfarm UK Ballach Ltd
149 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Clashindarroch Windfarm Extension
Onshore wind · Clashindarroch Windfarm Extension Limited
145 MWScoping Clashindarroch Windfarm Extension 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Farr WindFarm
Onshore wind · Farr Windfarm Limited
145 MWScoping Farr Wind Farm 132/33Kv Substation
SSEN Transmission (north Scotland)
Jan 2030
Beinneun 2 Windfarm
Onshore wind · Beinneun 2 Limited
144 MWScoping Beinneun Windfarm 2
SSEN Transmission (north Scotland)
Oct 2037
Aberarder Extension Wind Farm
Wind + storage · Renewable Energy Systems Limited
138 MWScoping Aberarder Extension Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2031
Knockton Wind Farm
Onshore wind · Perigus Energy UK Limited
130 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Altnabreac Windfarm
Wind + storage · Altnabreac Wind Farm Limited
130 MWScoping Connagill 275kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Glendye Wind Farm
Onshore wind · Glendye Wind Farm Limited
125 MWScoping Glendye Wind Farm Substation
SSEN Transmission (north Scotland)
Oct 2028
Energy Isles
Onshore wind · Energy Isles Shetland Limited
120 MWConsents Approved Energy Isles 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Highland BESS
Battery storage · Apatura Battery Ltd
120 MWScoping Highland BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2030
Culachy Wind Farm
Wind + storage · Fred Olsen Renewables Limited
115 MWScoping Fort Augustus 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Lethen Wind Farm
Onshore wind · Fred Olsen Renewables Limited
114 MWScoping Lethen Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2033
Slickly Wind Farm
Wind + storage · Slickly Wind Farm Limited
114 MWConsents Approved Slickly Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Coille Linne
Wind + storage · Energyfarm UK Coille Linne Ltd
113 MWScoping Coille Linne 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Teindland Wind Farm
Onshore wind · Teindland Wind Farm Limited
112 MWAwaiting Consents Blackhillock substation
SSEN Transmission (north Scotland)
Sep 2029
Colmealie Wind - Solar - BESS Farm
Solar + storage · Galileo 21 Limited
112 MWScoping New Fetteresso 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2037
Beinneun Wind Farm
Onshore wind · Beinneun Wind Farm Ltd
109 MWBuilt Beinneun 132kV Substation
SSEN Transmission (north Scotland)
Bhlaraidh Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Bhlaraidh 132/33kV Substation
SSEN Transmission (north Scotland)
Gordonbush Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Gordonbush GSP
SSEN Transmission (north Scotland)
Limekiln
Wind + storage · Limekiln Extension Limited
106 MWBuilt Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Achany Extension Wind Farm
Onshore wind · Sse Generation Limited
105 MWAwaiting Consents ACHANY EXTENSION WIND FARM 132/33KV Substation
SSEN Transmission (north Scotland)
Mar 2028
Aultmore Wind Farm (2023)
Wind + storage · Vattenfall Wind Power Ltd
105 MWScoping Aultmore Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Creag Riabhach Wind Farm
Onshore wind · Creag Riabhach Wind Farm Ltd
105 MWScoping Creag Riabhach 132/33kV Substation
SSEN Transmission (north Scotland)
Jul 2027
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)
Solar + storage · Scottish Power Renewables (UK) Limited
105 MWScoping Earraghail 275/33KV Substation
SSEN Transmission (north Scotland)
Apr 2031
Eredine Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
105 MWScoping An Suidhe 275/33kV
SSEN Transmission (north Scotland)
Nov 2029
Fasque Windfarm
Solar · Scottish Power Renewables (UK) Limited
105 MWScoping Fetteresso 132kV substation
SSEN Transmission (north Scotland)
Oct 2031
Kinmuck PV and BESS Station
Solar + storage · Kinmuck Energy Storage Limited
105 MWAwaiting Consents Kinmuck BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2027
Ourack Wind Farm
Wind + storage · Ourack Wind Farm LLP
105 MWScoping Ourack Wind Farm 132/33 kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Glentarken Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
104 MWScoping Glentarken Wind Farm 132/33Kv Substation
SSEN Transmission (north Scotland)
Nov 2031
Beaw Field Wind Farm
Onshore wind · Beaw Field Shetland Limited
102 MWConsents Approved Beaw Field 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Bhlaraidh Extension Wind Farm
Onshore wind · Sse Generation Limited
101 MWScoping Bhlaraidh 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2029
Cruach Bhreac Wind Farm
Onshore wind · Statkraft UK Ltd
101 MWScoping Craig Murrail 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Dunach Wind Farm
Onshore wind · Galileo 04 Limited
101 MWScoping Dunach Wind 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Statkraft SEWF
Onshore wind · Statkraft UK Ltd
101 MWScoping Orrin GSP
SSEN Transmission (north Scotland)
Oct 2033
Beauly 02 BESS
Battery storage · Field Beauly Ltd
100 MWScoping BEAULY 02 BESS 132kV SUBSTATION
SSEN Transmission (north Scotland)
Dec 2028
Cott's Farm
Solar + storage · Boralex Limited
100 MWScoping Cott's Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Farm 100MW BESS
Battery storage · Apatura Battery Ltd
100 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Pentland Floating Offshore Wind Farm
Offshore wind · Highland Wind Limited
100 MWConsents Approved Pentland Floating Offshore Wind Farm 132/66kV substation
SSEN Transmission (north Scotland)
Apr 2028
Scaraben Offshore Wind Farm
Offshore wind · Scaraben Offshore Wind Farm Limited
100 MWScoping Longside 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Sheilhill Battery Storage
Battery storage · Sheilhill Battery Storage Limited
100 MWAwaiting Consents St Fergus 132Kv Switching Station
SSEN Transmission (north Scotland)
Oct 2033
Sinclair Offshore Wind Farm
Offshore wind · Sinclair Offshore Wind Farm Limited
100 MWScoping Longside 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Sleat Hybrid
Wind + storage · Galileo 13 Limited
100 MWScoping Broadford GSP
SSEN Transmission (north Scotland)
Oct 2034
St Fergus
Solar + storage · Ib Vogt UK Ltd
100 MWScoping St Fergus
SSEN Transmission (north Scotland)
Oct 2033

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.