Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 24 of 46
ProjectCapacityStageConnection siteFrom
TH Didcot
Battery storage · FRV Powertek Limited
200 MWScoping Chiltern Connection Node D 400kV
National Grid (England & Wales)
Oct 2037
TH Knaresborough
Battery storage · FRV Powertek Limited
200 MWScoping Leeds North Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2036
TH Maes Melin
Battery storage · FRV Powertek Limited
200 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
TH Ninfield
Battery storage · FRV Powertek Limited
200 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
TH West Weybridge
Battery storage · FRV Powertek Limited
200 MWScoping London West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Thornton BESS
Battery storage · Rewe 9 Limited
200 MWScoping North Humber Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Thurcroft Storage
Battery storage · Bsr Applications Limited
200 MWScoping Leeds South Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2039
Tolkien Solar Farm
Solar + storage · Tolkien Solar Farm Limited
200 MWScoping Tolkien Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Tyler Hill Ansty
Battery storage · FRV Tyler Hill BESS 1 Ltd
200 MWScoping Warwickshire Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2037
UK105-B Upland Arms
Solar + storage · Uruk BESS Limited
200 MWScoping Llandyfaelog 400/132kV Substation
National Grid (England & Wales)
Dec 2036
Walsoken Battery
Battery storage · Walsoken Limited
200 MWScoping North Anglia Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2034
Waltham Cross Farm
Solar + storage · Waltham Cross 2 Renewables Limited
200 MWScoping Waltham Cross 400kV Substation
National Grid (England & Wales)
Apr 2033
Warley Battery Energy Storage
Battery storage · London And Essex Energy Limited
200 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2029
West Melton PV & BESS Station
Solar + storage · Ibv West Melton Solar Park Limited
200 MWScoping Leeds North Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
West Saval Battery Storage
Battery storage · West Saval Battery Storage Ltd
200 MWScoping West Saval Substation 132 kV
SSEN Transmission (north Scotland)
Oct 2030
Whitecraig BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Dalkeith 400kV Substation
SP Transmission (south Scotland)
Jun 2031
Whitehill Battery Storage
Battery storage · Whitehill Battery Storage Ltd
200 MWConsents Approved Easterhouse 275kV
SP Transmission (south Scotland)
Oct 2028
WindyHill BESS2 Facility
Battery storage · Windyhill Grid 2 Ltd
200 MWScoping Windyhill 275/132kV
SP Transmission (south Scotland)
Jul 2025
WindyHill Energy Storage Facility
Battery storage · Windyhill Grid 1 LTD
200 MWConsents Approved Windyhill 132kV
SP Transmission (south Scotland)
Dec 2027
Womblehill BESS Farm
Battery storage · RE Projects Development Limited
200 MWScoping Womblehill BESS Farm 132kV
SSEN Transmission (north Scotland)
Dec 2029
Woodcock Faulds Battery Storage
Battery storage · Woodcock Faulds Battery Storage Limited
200 MWScoping Gartclash Collector 275Kv Substation
SP Transmission (south Scotland)
Oct 2029
Worset Lane BESS
Battery storage · Field Hartmoor Ltd
200 MWConsents Approved Hartmoor 275kV Substation
National Grid (England & Wales)
May 2029
Yaxley BESS
Battery storage · Field Yaxley Ltd
200 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Yaxley Farm
Solar + storage · 548 UK Investment Holdings Limited
200 MWScoping Yaxley 400kV Substation
National Grid (England & Wales)
Oct 2032
Zenobe Blackhillock 300 MW
Battery storage · Zenobe Blackhillock Limited
200 MWBuilt Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Zenobe Coalburn Battery Storage
Battery storage · Zenobe Coalburn Limited
200 MWConsents Approved Coalburn North 400kV Substation
SP Transmission (south Scotland)
Aug 2027
Zenobe New Deer Battery Storage
Battery storage · Zenobe Energy Limited
200 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Thornton Facility
Solar + storage · Balwen Limited
200 MWConsents Approved Thornton 400kV Substation
National Grid (England & Wales)
Oct 2027
Tyler Hill Iver
Battery storage · FRV Powertek Limited
200 MWAwaiting Consents London West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2038
Manor Farm_Sidcup
Battery storage · Firstway Solar Ltd
200 MWScoping North Kent Connection Node C 132Kv Substation
National Grid (England & Wales)
Oct 2037
Mill Hey_Capenhurst BESS
Battery storage · Firstway Solar Ltd
200 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
Inveroykel Wind Farm
Onshore wind · Rwe Renewables UK Swindon Limited
191 MWScoping Inveroykel Wind Farm 132kV
SSEN Transmission (north Scotland)
Oct 2031
Deeside Power Station
Battery storage · Deeside Power (UK) Limited
190 MWBuilt Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2026
Drax
Solar + storage · Enso Green Holdings D Limited
190 MWAwaiting Consents Drax 132kV Substation
National Grid (England & Wales)
Oct 2029
Llanwern Phase 2
Solar · Future Energy Llanwern Limited
190 MWAwaiting Consents Whitson 275kV Substation
National Grid (England & Wales)
Oct 2028
Garreg Fawr Energy Park
Onshore wind · Garreg Fawr Energy Park Limited
190 MWScoping Pont Abraham GSP
National Grid (England & Wales)
Oct 2026
Muaitheabhal Wind Farm
Hydro and pumped storage · Uisenis Power Limited
189 MWConsents Approved Muaitheabhal 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2030
Griffin Wind Farm
Onshore wind · Griffin Wind Farm Limited
189 MWBuilt Griffin 132/33kV Substation
SSEN Transmission (north Scotland)
Tarenni
Onshore wind · Tarenni Energy Park Limited
188 MWScoping Rhigos 400kV Substation
National Grid (England & Wales)
Dec 2030
Clune Wind Farm
Wind + storage · Renewable Energy Systems Limited
187 MWScoping Clune 132/33 kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Walney I Offshore Wind Farm
Offshore wind · Walney (UK) Offshore Windfarms Limited
182 MWBuilt Walney 1 33/132kV Offshore Substation
Offshore transmission owner
Walney II Offshore Wind Farm
Offshore wind · Walney (UK) Offshore Windfarms Limited
182 MWBuilt Walney 2 33/132kV Substation
Offshore transmission owner
M74 West Wind Farm
Solar + storage · Renewco Power Limited
180 MWScoping M74 West Wind Farm 132kV
SP Transmission (south Scotland)
Oct 2029
Menter Mon Morlais Anglesey Marine Energy
Other · Menter Môn Morlais Limited
180 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2032
NEL Nicholson
Battery storage · UE 2 LTD
180 MWScoping Thorpe Marsh GSP
National Grid (England & Wales)
Oct 2035
North Ray Solar Farm 2
Solar · North Ray Solar Farm 2 Ltd
180 MWScoping Grimsby West GSP
National Grid (England & Wales)
Oct 2035
Norton Solar Farm
Solar · RWE Renewables UK Solar and Storage Limited
180 MWScoping Norton GSP
National Grid (England & Wales)
Oct 2031
Stornoway Wind Farm
Onshore wind · Stornoway Wind Farm Limited
180 MWConsents Approved Arnish 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Sundhope Wind Farm
Onshore wind · Black Knowe Energy Limited
180 MWScoping Sundhope 132kV Substation
SP Transmission (south Scotland)
May 2033
Dorenell Windfarm
Onshore wind · Dorenell Windfarm Limited
177 MWBuilt Dorenell 132/33kV Substation
SSEN Transmission (north Scotland)
Page 24 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.