SOLAR + STORAGE · NGETWaltham Cross Farm
Waltham Cross Farm is a 200 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Waltham Cross 400kV Substation, with capacity due from April 2033. The connection agreement is held by Waltham Cross 2 Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002687
- Customer
- Waltham Cross 2 Renewables Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 4 April 2033
- Connection site
- Waltham Cross 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem