Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· NGET

Garreg Fawr Energy Park

Garreg Fawr Energy Park is a 190 MW onshore wind project in planning, connecting to the National Grid (England & Wales) network at Pont Abraham GSP, with capacity due from October 2026. The connection agreement is held by Garreg Fawr Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2026 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001882
Customer
Garreg Fawr Energy Park Limited
Technology
Wind Onshore
Total capacity
190 MW
Change in this agreement
+190 MW
Capacity effective from
31 October 2026
Connection site
Pont Abraham GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Pont Abraham GSP Β· Grid map

Other projects at Pont Abraham GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem