Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the SSEN Transmission (north Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| New Deer Battery Storage Battery storage · New Deer Energy Centre Limited |
500 MW | Scoping |
| New Deer BESS Station Battery storage · Abbotshaugh Energy Storage Limited |
500 MW | Scoping |
| Peterhead Battery Battery storage · Peterhead Flexpower Ltd |
500 MW | Scoping |
| Rothienorman Battery Battery storage · Blackford Renewables Ltd |
500 MW | Scoping |
| Sealtainn Offshore Wind Farm Offshore wind · Shetland Offshore Wind Limited |
500 MW | Scoping |
| South Powrie Farm Battery storage · Qair Renewables UK Limited |
500 MW | Scoping |
| Magwind Offshore wind · Magnora Offshore Wind N3 Limited |
495 MW | Scoping |
| Peterhead PV and BESS Station Solar + storage · ETP UK 2 LTD |
480 MW | Awaiting Consents |
| Caithness Energy Storage Battery storage · Baywa R.e. UK Limited |
456 MW | Scoping |
| Alyth Solar + storage · Ecodev (Alyth) Ltd |
450 MW | Scoping |
| Alyth Energy Storage And Solar Solar + storage · Private Energy Partners (UK) Ltd |
400 MW | Scoping |
| Coachford 400MW BESS Battery storage · Field Woodhead Ltd |
400 MW | Scoping |
| Field Kinardochy BESS Battery storage · Field Kinardochy Ltd |
400 MW | Scoping |
| Keith BESS Station Battery storage · Ibv Coachford Energy Park Ltd |
400 MW | Scoping |
| Netherton BESS Battery storage · Harmony Energy Limited |
400 MW | Scoping |
| Alcemi Midmill BESS Battery storage · Alcemi Storage Developments 2 Limited |
300 MW | Scoping |
| Green Volt Offshore Windfarm Offshore wind · Green Volt Offshore Windfarm Ltd |
300 MW | Scoping |
| Kynachan Battery storage · Geocore Ltd |
300 MW | Scoping |
| Loch Fearna Pumped Storage Hydro and pumped storage · Fearna Psh Limited |
300 MW | Awaiting Consents |
| Longmorn Energy Park Solar + storage · Elgin Energy Es Co Limited |
300 MW | Scoping |
| Rattray BESS and Solar Plant Solar + storage · Greentech Projects Holding UK Limited |
300 MW | Scoping |
| Spittal BESS Battery storage · Field Spittal Ltd |
300 MW | Scoping |
| Stirling BESS Battery storage · Anesco Limited |
300 MW | Scoping |
| Beinn Dearg Solar + storage · Galileo 19 Limited |
290 MW | Scoping |
| MeyGen Tidal Battery storage · Meygrid Limited |
287 MW | Scoping |
| Dunan Hill Wind + storage · Perigus Energy UK Limited |
250 MW | Scoping |
| Peninsula Energy Park Onshore wind · Renantis UK Limited |
250 MW | Scoping |
| Stracathro BESS Battery storage · Opdenergy UK 8 Limited |
249 MW | Scoping |
| Whitehouse BESS station Battery storage · Igp International Prospecting Limited |
249 MW | Scoping |
| Glen Ullinish Extension Onshore wind · Glen Ullinish Wf 2 Ltd |
240 MW | Awaiting Consents |
| Glenmoy Wind Solar & BESS Solar + storage · Galileo 20 Limited |
224 MW | Scoping |
| Garvary Wind Farm Onshore wind · Garvary Wind Farm Limited |
222 MW | Scoping |
| Cnoc Buidhe Wind Farm Wind + storage · Cnoc Buidhe Wind Energy Hub Limited |
220 MW | Scoping |
| L48 BESS Dams of Craigie Solar + storage · S4 UK DEV LTD |
220 MW | Scoping |
| Clash Gour Wind + storage · Clash Gour Windfarm Holdings Limited |
210 MW | Awaiting Consents |
| Achies BESS Battery storage · Igp Energy Storage 5 Limited |
200 MW | Scoping |
| Ardonald Wind Farm Solar + storage · Ardonald Renewables Limited |
200 MW | Scoping |
| Blairgowrie BESS Battery storage · Woodside BESS Ltd |
200 MW | Scoping |
| Broadford BESS Battery storage · Field Devco Ltd |
200 MW | Scoping |
| Cloiche Wind Farm Onshore wind · Sse Generation Limited |
200 MW | Scoping |
| Corriemoillie BESS Battery storage · Field Corriemoillie Ltd |
200 MW | Scoping |
| Dalchork Farm Battery storage · Qair Renewables UK Limited |
200 MW | Scoping |
| Dounreay BESS Battery storage · Field Devco Ltd |
200 MW | Scoping |
| Fort Augustus BESS Battery storage · Field Devco Ltd |
200 MW | Scoping |
| Fyrish Battery Storage Battery storage · Field Fyrish Ltd |
200 MW | Scoping |
| Isenau Four Battery storage · Isenau Energy Storage Resources Four Limited |
200 MW | Scoping |
| Knocknagael BESS Battery storage · Field Knocknagael Ltd |
200 MW | Awaiting Consents |
| L48 BESS Burnside Battery storage · S4 UK DEV LTD |
200 MW | Scoping |
| Longside BESS Battery storage · Baywa R.e. UK Limited |
200 MW | Scoping |
| Lythmore Solar + storage · Qair Scotland Limited |
200 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.