OFFSHORE WIND · SHETGreen Volt Offshore Windfarm
Green Volt Offshore Windfarm is a 300 MW offshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at New Deer 400kV Substation, with capacity due from March 2029. The connection agreement is held by Green Volt Offshore Windfarm Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Mar 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001469-1
- Customer
- Green Volt Offshore Windfarm Ltd
- Technology
- Demand, Wind Offshore
- Total capacity
- 300 MW
- Change in this agreement
- +300 MW
- Capacity effective from
- 31 March 2029
- Connection site
- New Deer 400kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at New Deer 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem