Rothienorman Battery

Rothienorman Battery is a 500 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Rothienorman 400kV Substation, with capacity due from July 2029. The connection agreement is held by Blackford Renewables Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jul 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001971
Customer
Blackford Renewables Ltd
Technology
Energy Storage System
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
30 July 2029
Connection site
Rothienorman 400kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Rothienorman · Grid map

Other projects at Rothienorman 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem