Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SHET

Stracathro BESS

Stracathro BESS is a 249 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Stracathro BESS 275kV Substation, with capacity due from June 2032. The connection agreement is held by Opdenergy UK 8 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002392
Customer
Opdenergy UK 8 Limited
Technology
Demand, Energy Storage System
Total capacity
249 MW
Change in this agreement
+249 MW
Capacity effective from
30 June 2032
Connection site
Stracathro BESS 275kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Stracathro BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem