Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SHETFort Augustus BESS
Fort Augustus BESS is a 200 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Fort Augustus 400kV, with capacity due from October 2035. The connection agreement is held by Field Devco Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2035 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004599
- Customer
- Field Devco Ltd
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 31 October 2035
- Connection site
- Fort Augustus 400kV
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1