Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETWhitehouse BESS station
Whitehouse BESS station is a 249 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Whitehouse 275kV Substation, with capacity due from October 2034. The connection agreement is held by Igp International Prospecting Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002237
- Customer
- Igp International Prospecting Limited
- Technology
- Demand, Energy Storage System
- Total capacity
- 249 MW
- Change in this agreement
- +249 MW
- Capacity effective from
- 31 October 2034
- Connection site
- Whitehouse 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem