🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown40097.8 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

400 projects · page 2 of 8
ProjectCapacityStageConnection siteFrom
Beatrice Wind Farm
Offshore wind · Beatrice Offshore Windfarm Limited
588 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
East West Interconnector
Interconnector · Eirgrid Interconnector Designated Activity Company
585 MWBuilt Deeside 400kV Substation
National Grid (England & Wales)
Gwynt Y Mor Offshore Wind Farm
Offshore wind · Gwynt Y Mor Offshore Wind Farm Limited
574 MWBuilt Gwynt y Mor 132/33kV Offshore Substation
Offshore transmission owner
Race Bank Wind Farm
Offshore wind · Race Bank Wind Farm Limited
565 MWBuilt Race Bank 132kV Substation
National Grid (England & Wales)
Cleve Hill Solar Park
Solar + storage · Cleve Hill Solar Park Limited
550 MWBuilt Cleve Hill 400kV Substation
National Grid (England & Wales)
Jun 2036
Greenlink
Interconnector · Greenlink Interconnector Limited
524 MWBuilt Pembroke 400kV Substation
National Grid (England & Wales)
Coalburn Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 4 Limited
500 MWBuilt Coalburn 400kV Substation
SP Transmission (south Scotland)
Greater Gabbard Offshore Wind Farm
Offshore wind · Greater Gabbard Offshore Winds Limited
500 MWBuilt Gabbard 33/132kV Offshore Substation
Offshore transmission owner
Auchencrosh (interconnector CCT)
Interconnector · Moyle Interconnector Limited
500 MWBuilt Auchencrosh 275kV
SP Transmission (south Scotland)
Shoreham
Gas · VPI Power Limited
460 MWBuilt Bolney 400kV Substation
National Grid (England & Wales)
JG Pears
Solar + storage · Jg Pears Grid Connection Limited
450 MWBuilt High Marnham 275kV Substation
National Grid (England & Wales)
Oct 2033
Neart Na Gaoithe Offshore Wind Farm
Offshore wind · Neart Na Gaoithe Offshore Wind Limited
448 MWBuilt Neart Na Gaoithe 220/66KV Offshore Substation
SP Transmission (south Scotland)
Cdcl
Gas · Uniper UK Limited
445 MWBuilt Cottam 400kV Substation
National Grid (England & Wales)
Enfield
Gas · Uniper UK Limited
442 MWBuilt Brimsdown 132kV Substation
National Grid (England & Wales)
Cruachan U3&4 Replacement
Hydro and pumped storage · Drax Pumped Storage Limited
440 MWBuilt Cruachan 275kV Substation
SP Transmission (south Scotland)
Hornsea Power Station 2A
Offshore wind · Breesea Limited
440 MWBuilt Hornsea Platform 2A Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2B
Offshore wind · Soundmark Wind Limited
440 MWBuilt Hornsea Platform 2B Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2C
Offshore wind · Sonningmay Wind Limited
440 MWBuilt Hornsea Power Station 2C Offshore platform Substation
National Grid (England & Wales)
Viking Wind Farm
Onshore wind · Viking Energy Wind Farm LLP
434 MWBuilt Kergord GSP
SSEN Transmission (north Scotland)
Great Yarmouth
Gas · RWE Generation UK Plc
420 MWBuilt Norwich Main 132kV
National Grid (England & Wales)
Corby
Gas · Corby Power Limited
401 MWBuilt Corby 132kV Substation
National Grid (England & Wales)
Dudgeon Offshore Wind Farm
Offshore wind · Dudgeon Offshore Wind Limited
400 MWBuilt Necton 400kV Substation
National Grid (England & Wales)
Hornsea Power Station 1A
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1A Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 1B
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1B Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 1C
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1C Offshore Substation
National Grid (England & Wales)
Rampion Offshore Wind Farm
Offshore wind · Rampion Offshore Wind Limited
400 MWBuilt Rampion 33/132kV Offshore
National Grid (England & Wales)
Lynemouth Power Station
Other · Lynemouth Power Limited
396 MWBuilt Blyth GSP
National Grid (England & Wales)
Kings Lynn A
Gas · RWE Generation UK Plc
395 MWBuilt Walpole 132kV Substation
National Grid (England & Wales)
West of Duddon Sands Offshore Wind Farm
Offshore wind · Morecambe Wind Limited
382 MWBuilt West of Duddon Sands 34/155kV Offshore Substation
Offshore transmission owner
Clyde North
Onshore wind · Clyde Windfarm (Scotland) Limited
375 MWBuilt Clyde North 275/33kV
SP Transmission (south Scotland)
Ffestiniog
Hydro and pumped storage · First Hydro Company
360 MWBuilt Ffestiniog 275kV Substation
National Grid (England & Wales)
Uskmouth
Battery storage · Uskmouth Energy Storage Limited
350 MWBuilt Uskmouth 132kV Substation
National Grid (England & Wales)
Welbar Energy Storage
Battery storage · Welbar Energy Storage Limited
350 MWBuilt Hams Hall 400kV Substation
National Grid (England & Wales)
Galloper Wind Farm
Offshore wind · Galloper Wind Farm Limited
348 MWBuilt Galloper North 132/33kV Substation
National Grid (England & Wales)
Walney 4 Offshore Wind Farm
Offshore wind · Walney Extension Limited
330 MWBuilt Walney 4 Offshore Substation
National Grid (England & Wales)
Walney 3 Offshore Wind Farm
Offshore wind · Walney Extension Limited
330 MWBuilt Walney 3 Offshore Substation
National Grid (England & Wales)
Sheringham Shoal Offshore Wind Farm
Offshore wind · Scira Offshore Energy Limited
315 MWBuilt Sheringham Shoal 33/132kV Offshore Substations
Offshore transmission owner
Whitelee
Onshore wind · Scottish Power Renewables (UK) Limited
305 MWBuilt Whitelee 275/33kV
SP Transmission (south Scotland)
Foyers
Hydro and pumped storage · Sse Generation Limited
300 MWBuilt Foyers 275kV Substation
SSEN Transmission (north Scotland)
Thanet Offshore Wind Farm
Offshore wind · Thanet Offshore Wind Limited
300 MWBuilt Thanet 33/132kV Offshore Substation
Offshore transmission owner
Thurrock Power Station
Battery storage · Thurrock Flexible Generation Limited
300 MWBuilt Tilbury 275kV Substation
National Grid (England & Wales)
Zenobe Kilmarnock South
Battery storage · Zenobe Kilmarnock South Limited
300 MWBuilt Kilmarnock South 400kV Substation
SP Transmission (south Scotland)
Spalding Energy Expansion
Battery storage · Spalding Energy Expansion Limited
300 MWBuilt Spalding North 400kV Substation
National Grid (England & Wales)
Hirwaun Power Station
Gas · Hirwaun Power Limited
299 MWBuilt Rhigos 400kV Substation
National Grid (England & Wales)
Tees Renewable Energy Plant
Other · Mgt Teesside Limited
285 MWBuilt Teeside Connection Node A 132kV Substation
National Grid (England & Wales)
Kilgallioch Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
274 MWBuilt Kilgallioch 275kV Substation
SP Transmission (south Scotland)
Lincs Offshore Wind Farm
Offshore wind · Lincs Wind Farm Limited
265 MWBuilt Lincs 33/132kV Offshore Substation
Offshore transmission owner
Burbo Bank Extension Offshore Wind Farm
Offshore wind · Burbo Extension Ltd
258 MWBuilt BURBO BANK EXTENSION OFFSHORE Substation
National Grid (England & Wales)
Peterborough
Gas · River Nene Power Limited
245 MWBuilt Walpole 132kV Substation
National Grid (England & Wales)
Whitelee Extension
Hydro and pumped storage · Scottish Power Renewables (UK) Limited
238 MWBuilt Whitelee Extension 275/33kV
SP Transmission (south Scotland)
Dec 2026

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.