🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Zenobe Kilmarnock South

Zenobe Kilmarnock South is a 300 MW battery storage project built and connected, connecting to the SP Transmission (south Scotland) network at Kilmarnock South 400kV Substation. The connection agreement is held by Zenobe Kilmarnock South Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001687
Customer
Zenobe Kilmarnock South Limited
Technology
Energy Storage System
Total capacity
300 MW
Already connected
300 MW
Connection site
Kilmarnock South 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kilmarnock South · Grid map

Other projects at Kilmarnock South 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem