Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTZenobe Kilmarnock South
Zenobe Kilmarnock South is a 300 MW battery storage project built and connected, connecting to the SP Transmission (south Scotland) network at Kilmarnock South 400kV Substation. The connection agreement is held by Zenobe Kilmarnock South Limited.
Connection details
- NESO project number
- PRO-001687
- Customer
- Zenobe Kilmarnock South Limited
- Technology
- Energy Storage System
- Total capacity
- 300 MW
- Already connected
- 300 MW
- Connection site
- Kilmarnock South 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Kilmarnock South 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem