OFFSHORE WIND Β· NGETGalloper Wind Farm
Galloper Wind Farm is a 348 MW offshore wind project built and connected, connecting to the National Grid (England & Wales) network at Galloper North 132/33kV Substation. The connection agreement is held by Galloper Wind Farm Limited.
Connection details
- NESO project number
- PRO-000162
- Customer
- Galloper Wind Farm Limited
- Technology
- Wind Offshore
- Total capacity
- 348 MW
- Already connected
- 348 MW
- Connection site
- Galloper North 132/33kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem