Grid infrastructure β€Ί Connection queue β€Ί Offshore wind

OFFSHORE WIND Β· NGET

Galloper Wind Farm

Galloper Wind Farm is a 348 MW offshore wind project built and connected, connecting to the National Grid (England & Wales) network at Galloper North 132/33kV Substation. The connection agreement is held by Galloper Wind Farm Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000162
Customer
Galloper Wind Farm Limited
Technology
Wind Offshore
Total capacity
348 MW
Already connected
348 MW
Connection site
Galloper North 132/33kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Galloper North Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem