OTHER · NGETTees Renewable Energy Plant
Tees Renewable Energy Plant is a 285 MW other project built and connected, connecting to the National Grid (England & Wales) network at Teeside Connection Node A 132kV Substation. The connection agreement is held by Mgt Teesside Limited.
Connection details
- NESO project number
- PRO-000278
- Customer
- Mgt Teesside Limited
- Technology
- Biomass
- Total capacity
- 285 MW
- Already connected
- 285 MW
- Connection site
- Teeside Connection Node A 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near Teeside Connection Node A · Grid map
Other projects at Teeside Connection Node A 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem