Grid infrastructure βΊ Connection queue βΊ Offshore wind
OFFSHORE WIND Β· NGETDudgeon Offshore Wind Farm
Dudgeon Offshore Wind Farm is a 400 MW offshore wind project built and connected, connecting to the National Grid (England & Wales) network at Necton 400kV Substation. The connection agreement is held by Dudgeon Offshore Wind Limited.
Connection details
- NESO project number
- PRO-000132
- Customer
- Dudgeon Offshore Wind Limited
- Technology
- Wind Offshore
- Total capacity
- 400 MW
- Already connected
- 400 MW
- Connection site
- Necton 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Necton 400kV Substation
- Norfolk BoreasOffshore wind Β· 1.3 GW Β· Scoping
- VanguardOffshore wind Β· 1.3 GW Β· Consents Approved
- Vanguard EastOffshore wind Β· 1.3 GW Β· Consents Approved
- Bradenham - Thetford (Necton) GEC (Ethos Green)Solar + storage Β· 850 MW Β· Scoping
- Norfolk BoreasOffshore wind Β· 400 MW Β· Awaiting Consents
- VanguardOffshore wind Β· 400 MW Β· Consents Approved
- Vanguard EastOffshore wind Β· 400 MW Β· Consents Approved
- Zenobe Necton BESSBattery storage Β· 300 MW Β· Scoping
- Necton Greener Grid ParkBattery storage Β· 78 MW Β· Awaiting Consents
- Necton Greener Grid ParkBattery storage Β· 0 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem