Grid infrastructure βΊ Connection queue βΊ Hydro and pumped storage
HYDRO AND PUMPED STORAGE Β· NGETFfestiniog
Ffestiniog is a 360 MW hydro and pumped storage project built and connected, connecting to the National Grid (England & Wales) network at Ffestiniog 275kV Substation. The connection agreement is held by First Hydro Company.
Connection details
- NESO project number
- PRO-000055
- Customer
- First Hydro Company
- Technology
- Pump Storage
- Total capacity
- 360 MW
- Already connected
- 360 MW
- Connection site
- Ffestiniog 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem