🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Solar interconnection queue in Texas

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown461105.8 GW
Active in queue105.8 GW461 requests
Agreement signed37.0 GW158 requests
Withdrawn37570.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

461 requests · page 1 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Spectra Solar
Solar · SE DC Devco
1,200 MWIn study Scurry, TXERCOT Dec 2025target 2028
Aurelius Solar
Solar · IP Roman, LLC
1,124 MWAgreement signed Deaf Smith, TXERCOT Jul 2023target 2028
Pumpville Ranch 1
Solar
1,000 MWPaused / redesign Val Verde, TXERCOT
Shadow Ranch Solar
Solar · LectricWind LLC
808 MWIn study Upton, TXERCOT Sep 2022target 2026
Indigo Solar 3
Solar · Indigo solar 3
800 MWIn study Fisher, TXERCOT Oct 2024target 2028
Blue Bird Solar
Solar · Gigawatt Solar LLC
773 MWAgreement signed Johnson, TXERCOT Nov 2021target 2028
Meitner Solar
Solar · IP Meitner, LLC
703 MWAgreement signed Gray, TXERCOT Aug 2022target 2027
Skylab Solar
Solar · EDF Renewables Development, Inc.
610 MWIn study Wharton, TXERCOT Jun 2020target 2025
Danish Fields Solar
Solar · Danish Fields Solar, LLC
603 MWAgreement signed Wharton, TXERCOT Apr 2018target 2026
Rocking X Solar
Solar · 7100 Tin Top LLC
602 MWIn study Parker, TXERCOT Oct 2023target 2027
Scorpius Solar
Solar · Ben Milam Solar 4
600 MWIn study Milam, TXERCOT Dec 2024target 2029
Capoterra
Solar
598 MWPaused / redesign Milam, TXERCOT Jun 2022
Brittlebush Solar
Solar
594 MWPaused / redesign Henderson, TXERCOT Jun 2022
Jenna Eco-Electric Solar
Solar · Clean Energy Holdings, LLC
576 MWIn study Fisher, TXERCOT May 2024target 2028
Renegade Project
Solar · Renegade Renewable LLC
516 MWAgreement signed Deaf Smith, TXERCOT Feb 2019target 2027
Point Mountain Solar
Solar
514 MWPaused / redesign Upton, TXERCOT Jul 2022target 2026
La Salle Solar
Solar · La Salle Solar LLC
513 MWAgreement signed La Salle, TXERCOT Apr 2023target 2027
Half Moon Solar
Solar · NextEra Energy Interconnection Holdings, LLC
513 MWAgreement signed Starr, TXERCOT Jan 2025target 2029
Velveteen Solar I
Solar · Velveteen Solar, LLC
509 MWIn study Baylor, TXERCOT Dec 2025target 2029
Bayside Solar
Solar
509 MWPaused / redesign Victoria, TXERCOT Feb 2021target 2026
Tabor Solar
Solar · Quanah Solar LLC
506 MWIn study Hardeman, TXERCOT Sep 2020target 2027
Big Field Solar
Solar · Big Field Solar Energy LLC
506 MWIn study Wilbarger, TXERCOT Jun 2025target 2029
Muy Grande Solar
Solar · ACE DevCo NC, LLC
503 MWIn study Starr, TXERCOT Jan 2024target 2029
Dog Star Solar II
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Dog Star Solar I
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Commodus Solar
Solar · IP Blackwell, LLC
502 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Solar
Solar · IP Cavell, LLC
502 MWIn study Castro, TXERCOT Jul 2024target 2029
Commodus 2 Solar
Solar · IP Blackwell II, LLC
502 MWIn study Swisher, TXERCOT Mar 2025target 2029
Titus Sienta Solar
Solar · Sol Sienta Solar, LLC
502 MWIn study Pecos, TXERCOT Oct 2023target 2028
MRR Solar
Solar · BOULEVARD ASSOCIATES, LLC
500 MWIn study Pecos, TXERCOT Jul 2025target 2030
Elk Ridge Solar
Solar · Boulevard Associates, LLC
500 MWIn study Pecos, TXERCOT Nov 2025target 2030
Antila Solar
Solar · Antila Solar LLC
500 MWAgreement signed Borden, TXERCOT Apr 2025target 2027
Draco Solar
Solar · Draco Solar LLC
500 MWIn study Borden, TXERCOT Apr 2025target 2027
Aquila Solar
Solar · Ben Milam Solar 5
500 MWIn study Milam, TXERCOT Nov 2025target 2026
Juno 3 Solar
Solar · Juno Solar 3
500 MWAgreement signed Borden, TXERCOT Mar 2025target 2027
Baker Branch Solar
Solar · Mockingbird Solar Center, LLC
469 MWAgreement signed Lamar, TXERCOT Mar 2020target 2026
Soleil Solar
Solar · Soleil Solar, LLC
452 MWAgreement signed Clay, TXERCOT Sep 2022target 2028
Zeissel Solar
Solar · ZSS Power, LLC
452 MWAgreement signed Knox, TXERCOT Feb 2022target 2028
Aurelius 2 Solar
Solar · IP Roman, LLC
445 MWIn study Deaf Smith, TXERCOT Dec 2023target 2028
Aurelius 3 Solar
Solar · IP Roman III, LLC
445 MWIn study Deaf Smith, TXERCOT Dec 2023target 2029
Tempesta
Solar
443 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Buffalo Creek
Solar · Lincoln Clean Energy Development
439 MWAgreement signed Fort Bend, TXERCOT Aug 2019target 2026
Poco Trail Solar
Solar · Eastern Trail Solar Center, LLC
439 MWIn study Wilbarger, TXERCOT Sep 2021target 2027
Sequoia II Solar
Solar · Deville Solar LLC
418 MWAgreement signed Callahan, TXERCOT Jan 2020target 2026
Star Of Texas Solar
Solar · BOULEVARD ASSOCIATES, LLC
415 MWIn study Pecos, TXERCOT Aug 2025target 2029
Green Holly Solar
Solar · Copenhagen Infrastructure Partners Fund IV
414 MWPaused / redesign Dawson, TXERCOT Jul 2018target 2026
Silverton Solar
Solar · NextEra Energy Interconnection Holdings, LLC
410 MWIn study Briscoe, TXERCOT Dec 2023target 2029
Grasshopper Solar
Solar · Grasshopper Solar LLC
408 MWIn study Haskell, TXERCOT Sep 2021target 2028
Caliche Mound Solar
Solar · Tierra Blanco Solar LLC
407 MWAgreement signed Deaf Smith, TXERCOT Jul 2020target 2026
Compadre Solar
Solar · Hill Solar I, LLC
406 MWAgreement signed Hill, TXERCOT Mar 2021target 2025
Page 1 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)