OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Clear River Gas |
1,030 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
1,020 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
870 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
870 MW | Withdrawn / abandoned |
| Energy Center Gas |
570 MW | Withdrawn / abandoned |
| Combined cycle (alt to Q442/472) Gas |
431 MW | Withdrawn / abandoned |
| Wind Onshore wind |
245 MW | Withdrawn / abandoned |
| Combustion Turbine Generator Gas |
238 MW | Withdrawn / abandoned |
| Combustion Turbine (Alt to Q523) Gas |
234 MW | Withdrawn / abandoned |
| Combustion Turbine Gas |
227 MW | Withdrawn / abandoned |
| Wind Onshore wind |
216 MW | Withdrawn / abandoned |
| Solar Solar |
196 MW | Withdrawn / abandoned |
| Solar Solar |
152 MW | Withdrawn / abandoned |
| Internal Combustion Gas |
119 MW | Withdrawn / abandoned |
| Wind Onshore wind |
113 MW | Withdrawn / abandoned |
| Combustion Turbine Gas |
110 MW | Withdrawn / abandoned |
| Simple Cycle gas turbine Gas |
110 MW | Withdrawn / abandoned |
| combustion turbine Gas |
97.0 MW | Withdrawn / abandoned |
| Wind Farm Onshore wind |
79.2 MW | Withdrawn / abandoned |
| Beacon Falls Energy Park Gas |
62.9 MW | Withdrawn / abandoned |
| Battery Storage Wind + storage |
52.3 MW | Withdrawn / abandoned |
| Combined Cycle Upgrade #1 Gas |
40.6 MW | Withdrawn / abandoned |
| Wind farm Onshore wind |
39.6 MW | Withdrawn / abandoned |
| Combined Cycle Uprate Gas |
30.0 MW | Withdrawn / abandoned |
| Combined Cycle Upgrate #3 Gas |
30.0 MW | Withdrawn / abandoned |
| Battery Storage Wind + storage |
25.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Bridgeport Energy Wet Compression Upgrade Gas |
18.0 MW | Withdrawn / abandoned |
| wind Onshore wind |
17.4 MW | Withdrawn / abandoned |
| Combustion Turbine Gas |
12.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
3.1 MW | Withdrawn / abandoned |
| Wind uprate Onshore wind |
2.9 MW | Withdrawn / abandoned |
| Solar Solar |
2.7 MW | Withdrawn / abandoned |
| Southbridge LFGTE Engine 2 Other |
1.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)231 Β· 27.2 GW
- MISO (Midcontinent)53 Β· 17.2 GW
- CAISO (California)91 Β· 12.3 GW
- SPP (Southwest Power Pool)72 Β· 11.1 GW
- ISO-NE (New England)46 Β· 7,500 MW
- West (non-ISO utilities)197 Β· 6,025 MW
- ERCOT (Texas)28 Β· 5,278 MW
- Southeast (non-ISO utilities)49 Β· 4,719 MW
- NYISO (New York)33 Β· 4,251 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)