United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 1,020 MW gas request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2015 (completed)
- Withdrawn / abandonedMay 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 580
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Anticipated interconnection is the National Grid 345kV line 366 between the West Farnum and Millbury substations, and/or the Eversource 345kV line 3361 between Sherman Rd and Blackstone.
- Location
- Worcester County, Massachusetts
- Technology
- Gas: 1,020 MW Β· Oil
- Total requested
- 1,020 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 November 2015
- Proposed online date
- May 2020
- Withdrawn
- May 2016
Location
Marker shows the centre of Worcester County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Worcester County
- Battery StorageBattery storage Β· 204 MW Β· agreement signed
- Battery StorageBattery storage Β· 300 MW Β· in study
- Battery StorageBattery storage Β· 180 MW Β· in study
- Combined Cycle Uprate #2Gas Β· 30.0 MW Β· built
- Crystal Lake Substation - NG Western MA Area Cluster StudySolar Β· 24.7 MW Β· built
- Solar with BatterySolar + storage Β· 10.0 MW Β· built
- Harrington Street PV Project (QF)Solar Β· 9.8 MW Β· built
- Litchfield substation - NG Western MA Area Cluster StudySolar Β· 9.5 MW Β· built
- N. Oxford Substation - NG Western MA Area Cluster StudySolar Β· 8.7 MW Β· built
- SolarSolar Β· 8.0 MW Β· built
- Fitchburg Renewable EnergyOther Β· 7.2 MW Β· built
- SolarSolar Β· 6.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem