United States › Grid › Interconnection queues › Maine

WIND + STORAGE · ISO-NE

Battery Storage

Battery Storage is a 25.1 MW wind + storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
577
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Larrabee Road Station,345 kV
Location
Franklin County, Maine
Technology
Wind: 25.1 MW · Battery
Total requested
25.1 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
12 November 2015
Proposed online date
November 2019
Withdrawn
August 2019

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine · Transmission lines in Maine

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem