| Project | Capacity | Status |
|---|---|---|
| Five Wells Solar Solar ยท Five Wells Solar Center LLC |
323 MW | |
| Remy Jade Power Station Gas ยท Remy Jade Generating, LLC |
306 MW | |
| Rodeo Ranch Energy Storage Other ยท Rodeo Ranch Energy Storage, LLC |
301 MW | |
| Tanzanite Storage Battery storage ยท Tanzanite Energy Storage LLC |
266 MW | |
| Anole BESS Battery storage ยท Anole Energy Storage, LLC |
247 MW | |
| True North Solar Solar ยท True North Solar LLC |
239 MW | |
| Shamrock Onshore wind ยท Shamrock Interconnection LLC |
224 MW | |
| Five Wells BESS Other ยท Five Wells Storage LLC |
221 MW | |
| Stillhouse Solar Solar ยท Stillhouse Solar LLC |
211 MW | |
| Holy ESS Other ยท Citadel BESS LLC |
209 MW | |
| Callisto I Energy Center Other ยท Callisto I energy center LLC |
206 MW | |
| Mercury II Solar Solar + storage ยท Mercury II Solar, LLC |
206 MW | |
| Walstrom BESS Battery storage ยท Sealy Power LLC |
205 MW | |
| Anemoi Energy Storage Other ยท Anemoi Energy Storage, LLC |
205 MW | |
| Corazon Storage Solar + storage ยท Guajillo Energy Storage LLC |
205 MW | |
| Ebony Energy Storage Other ยท Ebony Energy Storage, LLC |
204 MW | |
| Turquoise Storage Other ยท BT Cunningham Storage, LLC |
196 MW | |
| Blevins Storage Battery storage ยท Blevins Solar, LLC |
181 MW | |
| Avila BESS Battery storage ยท BRP Avila BESS LLC |
164 MW | |
| Hart Wind Onshore wind ยท Hart Wind Project LLC |
163 MW | |
| Wolf Tank Storage Other ยท Lobo Storage |
156 MW | |
| Desert Willow BESS Battery storage ยท Desert Willow Energy Storage, LLC |
154 MW | |
| Timberwolf BESS 2 Other ยท Crane 2 BESS, LLC |
150 MW | |
| Sheep Creek Storage Other ยท Longhorn Storage LLC |
142 MW | |
| Pioneer DJ Wind Onshore wind ยท Pioneer Hutt Wind Energy LLC |
140 MW | |
| Blue Summit I Repower Wind + storage |
135 MW | |
| Giga Texas Energy Storage Other ยท Giga Texas Energy, LLC. |
131 MW | |
| Anchor Wind II Onshore wind |
129 MW | |
| Connolly Storage Other ยท BT Connolly Storage, LLC |
125 MW | |
| Great Kiskadee Storage Battery storage ยท Great Kiskadee Storage, LLC |
103 MW | |
| Angelo Storage Other ยท Angelo Storage, LLC |
103 MW | |
| St. Gall I Energy Storage Other ยท St. Gall Energy Storage I LLC |
103 MW | |
| River Bend Other ยท Brazos Bend BESS LLC |
102 MW | |
| St. Gall II Energy Storage Battery storage ยท St. Gall Energy Storage LLC |
100 MW | |
| Coral Storage Other ยท Copperhead Solar, LLC |
99.0 MW | |
| Dogfish BESS Battery storage ยท Dogfish ESS Assets, LLC |
78.2 MW | |
| House Mountain Other ยท House Mountain LLC |
63.0 MW | |
| Lower Rio BESS Battery storage ยท VESI 38 LLC |
60.4 MW | |
| Cross Trails Storage Battery storage ยท Cross Trails Energy Storage Project, LLC |
58.3 MW | |
| Gransolar Texas One Solar ยท Gransolar Texas One, LLC |
50.8 MW | |
| Teco GTG2 Gas ยท Thermal Energy Corp. |
50.0 MW | |
| Bastrop Energy Center AGP repower Phase II Gas |
21.0 MW | |
| Bastrop Energy Center AGP repower Phase I Gas |
21.0 MW | |
| Anchor Wind IV Onshore wind |
19.3 MW | |
| Ebony Energy Storage Repowering Battery storage |
5.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)45 ยท 6,782 MW
- West (non-ISO utilities)31 ยท 2,951 MW
- ISO-NE (New England)5 ยท 367 MW
- Southeast (non-ISO utilities)5 ยท 256 MW
- CAISO (California)2 ยท 23.1 MW
- SPP (Southwest Power Pool)1 ยท 10.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)