BATTERY STORAGE Β· ERCOTAvila BESS
Avila BESS is a 164 MW battery storage request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 23INR0287
- Grid region
- ERCOT (Texas)
- Developer
- BRP Avila BESS LLC
- Connection point (POI)
- 38340 TN Airport 138kV
- Technology
- Battery: 164 MW
- Total requested
- 164 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 31 May 2021
- Agreement signed
- 6 February 2023
- Proposed online date
- September 2025
- Came online
- September 2025
Location
No county location in the queue data.