United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTLower Rio BESS
Lower Rio BESS is a 60.4 MW battery storage request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 22INR0468
- Grid region
- ERCOT (Texas)
- Developer
- VESI 38 LLC
- Connection point (POI)
- 5792 Sioux 138kV
- Technology
- Battery: 60.4 MW
- Total requested
- 60.4 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 9 February 2021
- Agreement signed
- 10 July 2023
- Proposed online date
- August 2025
- Came online
- August 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem