United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Blevins Storage

Blevins Storage is a 181 MW battery storage request built and operating in the ERCOT interconnection queue, in Falls County, Texas.

Queue statusOperating
  1. PlanningQueued Feb 2021 (completed)
  2. ConsentedJun 2023 (completed)
  3. Construction (completed)
  4. OperatingNov 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0119
Grid region
ERCOT (Texas)
Developer
Blevins Solar, LLC
Connection point (POI)
Tap Bellfalls Switch (3404) – Lake Creek Switch (3409)
Location
Falls County, Texas
Technology
Battery: 181 MW
Total requested
181 MW
Study phase
IA
Queue status
Operational
Entered queue
3 February 2021
Agreement signed
17 June 2023
Proposed online date
November 2025
Came online
November 2025

Location

Marker shows the centre of Falls County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Falls County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem