United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTTrue North Solar
True North Solar is a 239 MW solar request built and operating in the ERCOT interconnection queue, in Falls County, Texas.
Request details
- Queue ID
- 23INR0114
- Grid region
- ERCOT (Texas)
- Developer
- True North Solar LLC
- Connection point (POI)
- Tap 345 kV St. Johns Switch (3384) βΓΓ¬ Jewett Switch (3390)
- Location
- Falls County, Texas
- Technology
- Solar: 239 MW
- Total requested
- 239 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 24 January 2021
- Agreement signed
- 20 April 2023
- Proposed online date
- December 2024
- Came online
- December 2024
Location
Marker shows the centre of Falls County; the queue data does not give exact sites.
Other requests in Falls County
- Blevins SolarSolar Β· 272 MW Β· agreement signed
- Roseland SolarSolar Β· 254 MW Β· agreement signed
- Roseland Solar IISolar Β· 254 MW Β· agreement signed
- Riverbend Solar SLFSolar + storage Β· 302 MW Β· in study
- Pasture Rose WindOnshore wind Β· 199 MW Β· in study
- Wang Solar SLFSolar + storage Β· 145 MW Β· in study
- Rosebud Solar SLFSolar + storage Β· 130 MW Β· in study
- Bronc Rodeo Solar ProjectSolar Β· 122 MW Β· in study
- Fallstone Solar SLFSolar + storage Β· 60.6 MW Β· in study
- Blevins StorageBattery storage Β· 181 MW Β· built
- Coral SolarSolar Β· 152 MW Β· built
- Spanish CrownSolar Β· 103 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem