United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTTimberwolf BESS 2
Timberwolf BESS 2 is a 150 MW other request built and operating in the ERCOT interconnection queue, in Crane County, Texas.
Request details
- Queue ID
- 22INR0495
- Grid region
- ERCOT (Texas)
- Developer
- Crane 2 BESS, LLC
- Connection point (POI)
- 76635 King Mt 138kV
- Location
- Crane County, Texas
- Technology
- Other: 150 MW
- Total requested
- 150 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 31 March 2021
- Agreement signed
- 8 October 2021
- Proposed online date
- December 2023
- Came online
- December 2023
Location
Marker shows the centre of Crane County; the queue data does not give exact sites.
Other requests in Crane County
- Soda Lake BESS 1Battery storage Β· 204 MW Β· agreement signed
- Soda Lake Solar 2 SLFSolar + storage Β· 202 MW Β· agreement signed
- Tri-X Solar 1 SLFSolar + storage Β· 202 MW Β· agreement signed
- Western Flats StorageSolar + storage Β· 411 MW Β· in study
- Western Flats SolarSolar + storage Β· 410 MW Β· in study
- Cattle Drive SolarSolar Β· 307 MW Β· in study
- Soda Lake BESS 2 SLFSolar + storage Β· 205 MW Β· in study
- Tri-X BESS 1 SLFSolar + storage Β· 205 MW Β· in study
- BRP Pictor BESSBattery storage Β· 201 MW Β· in study
- BRP Ampato BESSBattery storage Β· 122 MW Β· in study
- Fowler Ranch StorageBattery storage Β· 26.1 MW Β· in study
- Tri-County SolarSolar Β· 178 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem