United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTAnchor Wind IV
Anchor Wind IV is a 19.3 MW onshore wind request built and operating in the ERCOT interconnection queue, in Eastland County, Texas.
Request details
- Queue ID
- 22INR0562
- Grid region
- ERCOT (Texas)
- Location
- Eastland County, Texas
- Technology
- Wind: 19.3 MW
- Total requested
- 19.3 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 2 December 2021
- Came online
- April 2024
Location
Marker shows the centre of Eastland County; the queue data does not give exact sites.
Other requests in Eastland County
- Anchor Wind IIIOnshore wind · 16.0 MW · agreement signed
- Silver Star repowerOnshore wind · -7.2 MW · agreement signed
- Damia SolarSolar + storage · 306 MW · in study
- Basketflower SolarSolar + storage · 183 MW · in study
- Damia StorageSolar + storage · 153 MW · in study
- Star Grass Renewable Energy Solar SLFSolar + storage · 150 MW · in study
- Basketflower StorageSolar + storage · 92.0 MW · in study
- Roadrunner Crossing Wind (Uprate)Wind + storage · 3.3 MW · in study
- Anchor Wind IIOnshore wind · 129 MW · built
- Roadrunner Crossing Wind SLFWind + storage · 128 MW · built
- Roadrunner Crossing Wind II SLFOnshore wind · 127 MW · built
- Anchor WindOnshore wind · 98.9 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem