United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESBattery storage interconnection queue in the USA — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Sherman Energy Storage Battery storage |
256 MW | In study |
| Gateway Energy Storage 2 Battery storage |
256 MW | In study |
| Nautilus Heavy Storage Battery storage · Nautilus Heavy Storage, LLC |
256 MW | In study |
| Leaning Tree BESS Battery storage |
256 MW | Paused / redesign |
| Maleza Storage II Battery storage · Brush Storage, LLC |
256 MW | In study |
| Lonesome Dove BESS Battery storage |
256 MW | Paused / redesign |
| Champs Elysees BESS Battery storage · Champs Elysees Renewables, LLC |
256 MW | In study |
| Nouveau BESS Battery storage · RamZ BESS, LLC |
256 MW | In study |
| Sandbar Energy Storage Battery storage |
256 MW | In study |
| Zeya BESS Battery storage · BRP Zeya BESS LLC |
255 MW | Agreement signed |
| PowerVault BESS Battery storage · SMT Elm Mott BESS |
255 MW | In study |
| Sandrift Storage 1 Battery storage |
255 MW | Agreement signed |
| Sandrift Storage 2 Battery storage |
255 MW | Agreement signed |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Battery storage project GEN-2021-029, Linn County Battery storage |
254 MW | In study |
| Grand Mesa BESS Battery storage · PERRY GREEN POWER LLC |
253 MW | In study |
| Bayside 2 BESS Battery storage |
252 MW | Paused / redesign |
| Greenwood Energy Storage Battery storage |
252 MW | Agreement signed |
| Zorin Storage Battery storage |
252 MW | Agreement signed |
| Little Ridge Storage Battery storage · TX BESS B LLC |
252 MW | In study |
| Eval Storage Battery storage · Hecate Grid East Valley Storage LLC |
252 MW | Agreement signed |
| Ogalalla Storage Battery storage · Hecate Energy Ogalalla Solar LLC |
252 MW | In study |
| Juniper Ridge BESS 2 Battery storage · Lazy U ESS 2 |
252 MW | In study |
| Juniper Ridge BESS 1 Battery storage · Lazy U ESS 1 |
252 MW | In study |
| Buffalo Creek BESS Battery storage · Old 300 Storage Center, LLC |
251 MW | Agreement signed |
| Mesa View Storage Battery storage · Mesa View Storage, LLC |
251 MW | In study |
| Althea Storage Battery storage · Sugaree Solar LLC |
251 MW | Agreement signed |
| Brela BESS LLC Battery storage · Brela BESS LLC |
251 MW | In study |
| Fort Concho Energy storage Battery storage · Rocky Mountain Energy Development, LLC |
251 MW | In study |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Rock Creek BESS Battery storage · Flat Rock Energy Center, LLC |
251 MW | Agreement signed |
| Tiger Storage Battery storage |
251 MW | Paused / redesign |
| Parula Energy Center Battery storage · Parula Energy Center |
251 MW | In study |
| Bluegill BESS Battery storage · Bluegill BESS, LLC |
251 MW | In study |
| Medway Grid Battery Storage Battery storage |
250 MW | Agreement signed |
| Battery storage project 5RSC-2024-11, Morgan County Battery storage |
250 MW | In study |
| Battery storage project J3836, Eaton County Battery storage |
250 MW | In study |
| Ca-CO-250B Battery storage |
250 MW | In study |
| Battery storage project J4167, Allegan County Battery storage |
250 MW | In study |
| Battery storage project J3845, Monroe County Battery storage |
250 MW | In study |
| Battery storage project GEN-2024-171, Tulsa County Battery storage |
250 MW | In study |
| Battery storage project J2628, Huron County Battery storage |
250 MW | In study |
| Battery storage project Company 237, Clark County Battery storage |
250 MW | Agreement signed |
| Battery storage project J3883, Crawford County Battery storage |
250 MW | In study |
| Commerce Energy Storage Battery storage |
250 MW | Agreement signed |
| Battery storage project 25-IC-1312, Coweta County Battery storage |
250 MW | In study |
| Battery storage project J4198, Christian County Battery storage |
250 MW | In study |
| Battery storage project AI1-149, Mchenry County Battery storage |
250 MW | In study |
| Battery storage project AI2-068, Monmouth County Battery storage |
250 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)724 · 133.4 GW
- West (non-ISO utilities)352 · 82.2 GW
- MISO (Midcontinent)305 · 55.0 GW
- CAISO (California)175 · 48.7 GW
- SPP (Southwest Power Pool)198 · 31.4 GW
- PJM (Mid-Atlantic, Midwest)248 · 29.6 GW
- Southeast (non-ISO utilities)109 · 19.4 GW
- NYISO (New York)84 · 11.1 GW
- ISO-NE (New England)31 · 6,907 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)