United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 86
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Buckaroo BESS Battery storage · Weatherford BESS LLC |
120 MW | In study |
| Wild Horse Desert Solar Solar + storage · Wild Horse Desert Solar, LLC |
120 MW | In study |
| Surplus; G736 Other |
120 MW | In study |
| Solar project AG2-516, Winnebago County Solar · Kestrel Solar, LLC |
120 MW | In study |
| Solar + storage project GEN-2024-373, Choctaw County Solar + storage |
120 MW | In study |
| Solar project GI-2024-10, Adams County Solar |
120 MW | In study |
| Solar + storage project 2021-G3, Pinal County Solar + storage |
119 MW | In study |
| Solar project 649, Muhlenberg County Solar |
119 MW | In study |
| Tracy Solar Energy Center Solar · Tracy Solar Energy Center, LLC |
119 MW | In study |
| Pradera Solar Solar + storage · Pradera Solar, LLC |
118 MW | In study |
| Solar + storage project AI1-174, Stephenson County Solar + storage |
118 MW | In study |
| Onshore wind project GEN-2023-088, Okfuskee County Onshore wind |
117 MW | In study |
| Battery storage project AH2-132, Salem County Battery storage |
117 MW | In study |
| Solar project J3539, Alcona County Solar |
117 MW | In study |
| Roxton Solar Solar + storage · Roxton Solar, LLC |
117 MW | In study |
| Shorebird Solar Solar |
117 MW | Paused / redesign |
| Pioneer Hutt Solar Solar |
116 MW | Paused / redesign |
| Butcherbird Solar Solar · Butcherbird Solar, LLC |
116 MW | In study |
| Pioneer Hutt Solar (Alternative POI) Solar · NextEra Energy Interconnection Holdings LLC |
116 MW | In study |
| Battery storage project GEN-2025-SR12, Noble County Battery storage |
116 MW | In study |
| Marcos BESS Solar + storage · GRS BESS Texas Eight LLC |
116 MW | In study |
| Solar project J2350, Pulaski County Solar |
116 MW | In study |
| Amphion Solar Phase 3 Solar · Amphion Solar, LLC |
115 MW | In study |
| Velado Storage SLF Solar + storage · Velado Solar, LLC |
115 MW | In study |
| Velado Solar SLF Solar + storage · Velado Solar, LLC |
115 MW | In study |
| Gas project BHBE G25, Pennington County Gas · Black Hills Power Inc. |
115 MW | In study |
| Battery storage project GEN-2024-295, Eddy County Battery storage |
115 MW | In study |
| SR Bacon II Solar Solar |
115 MW | In study |
| Battery storage project IA-PNM-2025-12, Cibola County Battery storage |
115 MW | In study |
| Battery storage project J3523, Barron County Battery storage |
115 MW | In study |
| Solar + storage project J2382, Randolph County Solar + storage |
115 MW | In study |
| Gas project 40603, Laramie County Gas · Cheyenne Light, Fuel and Power Company |
115 MW | In study |
| Solar project AG2-583, Cumberland County Solar · Boston Hill Solar, LLC |
115 MW | In study |
| Gas project CLPT G30, Laramie County Gas · Black Hills Electric Generation, LLC |
115 MW | In study |
| Gas project 40969, Laramie County Gas · Cheyenne Light, Fuel and Power Company |
115 MW | In study |
| Solar + storage project J2886, Sangamon County Solar + storage |
115 MW | In study |
| Battery storage project 563648, Gaston County Battery storage |
115 MW | In study |
| Battery storage project AH2-332, Prince George's County Battery storage |
115 MW | In study |
| Solar project J4142, Franklin Parish County Solar |
115 MW | In study |
| Gas project CLPT G31, Laramie County Gas · Cheyenne Light, Fuel & Power |
115 MW | In study |
| Solar + storage project J4139, Nevada County Solar + storage |
115 MW | In study |
| Solar project AH2-264, Van Wert County Solar |
115 MW | In study |
| Battery storage project 956294, Rockingham County Battery storage |
115 MW | In study |
| Hayrick BESS Battery storage · Gransolar Texas Five LLC |
114 MW | In study |
| Neptune Gas Generation Plant Gas · BPX Production Company |
114 MW | In study |
| Solar project GEN-2022-104, Bryan County Solar |
113 MW | In study |
| Lost Pines Gas Recip Phase 2 Gas · LCRA |
113 MW | In study |
| Solar project J3687, Fayette County Solar |
113 MW | In study |
| Angus Solar Solar · Angus Solar, LLC |
113 MW | Paused / redesign |
| Schneider Gas Rice Gas · LCRA |
113 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)