United States › Grid › Interconnection queues › South Dakota

GAS · WEST

Gas project BHBE G25, Pennington County

Gas project BHBE G25, Pennington County is a 115 MW gas request in interconnection study in the West interconnection queue, in Pennington County, South Dakota, connecting to Black Hills Power.

Queue statusIn planning
  1. PlanningQueued Jun 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
BHBE G25
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Power
Developer
Black Hills Power Inc.
Connection point (POI)
Lange Substation
Location
Pennington County, South Dakota
Technology
Gas: 115 MW
Total requested
115 MW
Service type
Network resource (NRIS)
Study phase
Transitional Cluster Study Final Report
Queue status
Active
Entered queue
13 June 2024
Proposed online date
June 2026

Location

Marker shows the centre of Pennington County; the queue data does not give exact sites.

Power plants in South Dakota · Transmission lines in South Dakota

Other requests in Pennington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem