United States › Grid › Interconnection queues › South Dakota
SOLAR · SPPSolar project GEN-2017-097, Pennington County
Solar project GEN-2017-097, Pennington County is a 128 MW solar request built and operating in the SPP interconnection queue, in Pennington County, South Dakota, connecting to WAPA.
Request details
- Queue ID
- GEN-2017-097
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Underwood 115 kV Sub
- Location
- Pennington County, South Dakota
- Technology
- Solar: 128 MW
- Total requested
- 128 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA FULLY EXECUTED/COMMERCIAL OPERATION
- Queue status
- Operational
- Entered queue
- 31 May 2017
- Proposed online date
- February 2024
- Came online
- June 2024
Location
Marker shows the centre of Pennington County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Pennington County
- Gas project BHBE G25, Pennington CountyGas · 115 MW · in study
- Gas project GI-0507, Pennington CountyGas · 76.2 MW · built
- Coal project GI-1106, Pennington CountyCoal · 500 MW · withdrawn
- Onshore wind project GI-0813, Pennington CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GI-1104, Pennington CountyOnshore wind · 200 MW · withdrawn
- Gas project BHBE G26, Pennington CountyGas · 125 MW · withdrawn
- Onshore wind project GI-0504, Pennington CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project GI-1005, Pennington CountyOnshore wind · 99.0 MW · withdrawn
- Gas project GI-0102, Pennington CountyGas · 40.0 MW · withdrawn
- Solar project GEN-2017-096, Pennington CountySolar · 25.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem