Interconnection queue in ERCOT (Texas) — page 6

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 6 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Boling Generation (TEF-Due Diligience)
Gas · Boling Generation
400 MWIn study Wharton, TXERCOT Dec 2023target 2027
Hanson Solar
Solar · Hanson Solar, LLC
399 MWAgreement signed Coleman, TXERCOT Oct 2020target 2027
Charger Solar
Solar · AP Solar 4, LLC
397 MWAgreement signed Refugio, TXERCOT Jun 2020target 2026
Bug Tussle Wind Project
Onshore wind · Bug Tussle Wind, LLC
397 MWAgreement signed Lamar, TXERCOT Jan 2022target 2027
Moon Chapel Wind
Onshore wind · Orsted Onshore Development North America, LLC
379 MWIn study Tom Green, TXERCOT Feb 2025target 2028
Paint Rock Wind
Onshore wind · Orsted Onshore Development North America, LLC
379 MWIn study Concho, TXERCOT Jan 2024target 2028
Panhandle Flagship Storage
Solar + storage · Panhandle Solar Group Operating Company LLC
372 MWAgreement signed Carson, TXERCOT Mar 2023target 2027
Kilby1 Part 1 Small Block Simple Cycle
Gas · Energy Forge One LLC
371 MWIn study Reeves, TXERCOT Oct 2025target 2027
Earthwise Solar
Solar · Quanah Solar 2
371 MWIn study Hardeman, TXERCOT Mar 2022target 2026
Skyrider Wind
Onshore wind · NextEra Energy Interconnection Holdings, LLC
370 MWIn study Pecos, TXERCOT Nov 2024target 2028
Viento Bravo Wind
Onshore wind · Webb Wind, LLC
367 MWIn study Jim Hogg, TXERCOT Oct 2025target 2028
Space City Solar
Solar · Apollo Solar Ranch, LLC
366 MWAgreement signed Wharton, TXERCOT Nov 2019target 2027
Scott Crossing Solar SLF
Solar + storage · FRESH AIR ENERGY II, LLC
364 MWIn study Haskell, TXERCOT Mar 2023target 2027
Aldrin 345 BESS
Battery storage · Aldrin Energy Storage LLC
362 MWAgreement signed Brazoria, TXERCOT May 2023target 2027
Channing Wind
Onshore wind
361 MWPaused / redesign Oldham, TXERCOT Dec 2023target 2028
Wildflower Storage
Battery storage · Wildflower Storage LLC
359 MWIn study Navarro, TXERCOT Jun 2025target 2028
Tetris Solar
Solar · NextEra Energy Interconnection Holdings LLC
359 MWIn study Zapata, TXERCOT Jul 2023target 2029
Tetris Solar (Alternative POI)
Solar
359 MWPaused / redesign Zapata, TXERCOT Jul 2023target 2028
Twinwood Solar 1
Solar · Twinwood PV1, LLC
358 MWIn study Waller, TXERCOT Mar 2024target 2027
Green Ocelot Solar
Solar + storage · Ocelot Solar LLC
357 MWIn study Kenedy, TXERCOT Jan 2025target 2028
Tormes Solar
Solar · BDPU SOLAR TORMES LLC
357 MWAgreement signed Navarro, TXERCOT Oct 2020target 2027
Funston Solar (AEP POI)
Solar
355 MWPaused / redesign Jones, TXERCOT Sep 2023target 2028
Max 4 Wind
Onshore wind · Lake Creek Wind, LLC
353 MWIn study Haskell, TXERCOT Jul 2025target 2028
Longview Wind
Onshore wind · Longview Wind, LLC
353 MWAgreement signed Dawson, TXERCOT Sep 2025target 2028
Chillingham Solar
Solar · Chillingham Solar LLC
352 MWAgreement signed Bell, TXERCOT Aug 2020target 2026
Lucy Solar
Solar · Concho County Solar 1 LLC
352 MWAgreement signed Concho, TXERCOT Jun 2023target 2027
Sombrero Solar
Solar · Aurora Solar LLC
352 MWIn study Schleicher, TXERCOT Mar 2022target 2028
West Munday Wind
Onshore wind · Lake Creek Wind, LLC
352 MWAgreement signed Knox, TXERCOT Nov 2024target 2028
Rowdy Creek Solar
Solar + storage · Rowdy Creek Solar LLC
352 MWAgreement signed Lamar, TXERCOT Jan 2022target 2027
Cottonwood Bayou Solar
Solar · Cottonwood Bayou Solar, LLC
351 MWAgreement signed Brazoria, TXERCOT Sep 2017target 2026
Fighting Jays Solar
Solar · AP Solar Holdings, LLC
351 MWAgreement signed Fort Bend, TXERCOT Mar 2019target 2026
Funston Solar
Solar · Funston Solar LLC
351 MWAgreement signed Jones, TXERCOT Feb 2024target 2027
Brookesmith Storage
Battery storage · Brookesmith Storage LLC
351 MWIn study Brown, TXERCOT Apr 2025target 2029
HyFuels Green Lake Solar
Solar · HyFuels Green Lake Solar LLC
347 MWIn study Victoria, TXERCOT Sep 2022target 2027
Rabbit Hollow Energy Storage
Battery storage · Rabbit Hollow Energy Storage, LLC
342 MWIn study Mitchell, TXERCOT Dec 2024target 2028
Baird North Wind
Onshore wind · BMP Wind, LLC
340 MWAgreement signed Callahan, TXERCOT May 2018target 2026
Titus Low Carbon Ventures Solar 1
Solar · Vaquero Solar, LLC
338 MWIn study San Patricio, TXERCOT Oct 2023target 2028
Briggs Storage
Solar + storage · IP Quantum III, LLC
336 MWAgreement signed Haskell, TXERCOT May 2021target 2028
Greyhound Solar
Solar · Rockhound Solar 2, LLC dba "Greyhound Solar"
336 MWAgreement signed Ector, TXERCOT Mar 2019target 2026
Cielo Vista Power Gas Plant
Gas · Cielo Vista Power, LLC
335 MWIn study Duval, TXERCOT Aug 2025target 2028
River Boat Power Gas Plant
Gas · Champion Creek Power, LLC
334 MWIn study Mitchell, TXERCOT Aug 2025target 2028
Three Canes Solar SLF
Solar · Three Canes Solar LLC
333 MWAgreement signed Navarro, TXERCOT Jul 2024target 2027
Mountaineer Solar
Solar · Mustang Mountaineer Solar LLC
332 MWIn study Brown, TXERCOT Apr 2019target 2028
Sky Global West Houston
Gas · Sky Global Power Two, LLC
325 MWAgreement signed Austin, TXERCOT Jul 2024target 2027
Briggs Solar
Solar + storage · IP Quantum III, LLC
324 MWAgreement signed Haskell, TXERCOT Aug 2020target 2028
Quantum Storage
Solar + storage · IP Quantum II BESS, LLC
322 MWAgreement signed Haskell, TXERCOT Mar 2024target 2026
Solace Storage
Solar + storage · IP Quantum BESS, LLC
322 MWAgreement signed Haskell, TXERCOT Mar 2024target 2026
Quantum Solar
Solar + storage · IP QUANTUM II, LLC
322 MWAgreement signed Haskell, TXERCOT Sep 2018target 2026
Solace Solar
Solar + storage · IP QUANTUM, LLC.
322 MWAgreement signed Haskell, TXERCOT Apr 2020target 2026
Pecan Prairie North
Solar · CG Leon County II LLC
321 MWAgreement signed Leon, TXERCOT Sep 2019target 2027
Page 6 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)