United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Wildflower Storage

Wildflower Storage is a 359 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
28INR0292
Grid region
ERCOT (Texas)
Developer
Wildflower Storage LLC
Connection point (POI)
Drane Switch 345 kV substation on Venus Switch (1906) - Navarro (68091) 345 kV line
Location
Navarro County, Texas
Technology
Battery: 359 MW
Total requested
359 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
5 June 2025
Proposed online date
September 2028

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Navarro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem